ITEM PARTICULARS QTY

1 GENERAL REQUIREMENTS
1.01 MOBILIZATION/ DEMOBILIZATION 1
1.02 BUILDING PERMITS/ OCCUPANCY PERMIT 1
1.03 PROFFESIONAL FEES, DESIGN, SIGNS & SEAL (ARCH/L ENGINEERED) 1
1.04 AS-BUILT PLANS, PLOTTING, BLUE PRINT, REPRODUCTION, ETC. 1
1.05 CONTRACTOR'S ALL RISK INSURANCE 1
1.08 TECHNICAL SUPERVISION AND TESTING DATA 1
PROJECT COORDINATOR, SAFETY OFFICER, CAD OPERATOR
1.09 PROJECT ADMIN COST 1
1.1O DELIVERY / HAULING OF MATERIALS, DEBRIS, GARBAGE, ETC. 1
1.11 FIRST AID KITS AND PPE 1
1.12 SITE TEMPORARY DAMAGE PROTECTION KIT 1
1.13 TEMPORARY BARRACKS & UTILITIES 1
UNIT COST/ MATERIAL COST (LABOR) TOTAL COST
UNIT TOTAL UNIT TOTAL

LOT 15,000
LOT
LOT
LOT 28,700
LOT 35,000
LOT

LOT
LOT
LOT
LOT
LOT