43

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
CAMPOM saecssnsnisss sees eseceteen (SPRCiY) Bedrooms (Second Floor) and Hall....... (Specify) Balcony (Secand Floor) (Specify) TILE WALL AND FLOOR FINISHES - The toilet and bathroom floors shall be finished with _(Specify brand) _ ceramic tiles carrying ‘thebrand, (Specify brand) _ Tiles. ~The walls of the toilets, bathrooms, top of kitchen cabinets, and laundry tub, and their adjacent walls shall be wainscoted with 200mm x 200mm (8" x 8") ceramic tiles. Interior and exteriar comers of tiled floors and walls shall be provided with the necessary tile "mouldings. ie All tiles for floor, walls and mouldings shall be free from laminations, serrated edges, chipped-off comers and other defects, which would adversely affect their appearance and strength. all joints between “files and mouldings shall be filed with___(Specify brand) white cement and then carefully wiped. Before the tiles and mouldings are laid in place, they shall be thoroughly soaked in water if scommended by the manufacturer. Mortar to be used in setting the tiles ancl moldings shall be a mixture ‘part cement and 2 parts sand by volume, IER - Lumber to be used in this project shall be well seasoned, thoroughly dry and free from loose or ound knots, shakes or other imperfections impairing their strength or appearances. ‘The kind of lumber to be used for the various parts of the bullding shall be as follows: Exterior door frames... cores (Specity) Interior door frames ‘hiadh (Specity) Purlins, Wall Studs, Ceiling Joists, Cleats ......... (Specify) Fascia Boards, Cabinets/Closet Shelves .......... (Specify) Stair Treads, Stringers, Risers and Handrails .... (Specify) All wood frames for windows, doors, cabinets and closets shall be done as much as possible, ‘carefully filed mortise and tenon joints. All door and window frames to be installed on concrete y block and other masonry walls shall be anchored with 76mm (3°) common wire nails all around the ol surfaces. And all such contact surfaces shall first be painted with (Specify brand) ‘wood before the frames are installed in place. ‘All unexposed lumber such as posts, plates, floor and roof beams, trusses of rafters, floor joists { bridgings, puriins, cleats, ceiling joists, wall studs, etc. shall likewise be treated with (Specify wood preservative after they have been installed in place. A38

You might also like