PROJECT : PROPOSED HOSPITAL BUILDING

LOCATION : BANILAD, MANDAUE CITY


DATE : MAY 10, 2005

459.53 235.00 459.53 574.41 293.75


H2G1 533.08 176.25 533.08 H2G1 619.24 220.32
30.02 1.29 30.02 1.29
DL DL
176.83 89.79 176.83 221.04 112.24
8.79 0.01 8.79 0.01
LL LL
53.72 28.00 53.72 67.15 35.00
10.48 10.48 10.48 10.48
EL/WL 99.08 - 99.08 EL/WL 99.08 -
8.50 27.8800 13.9400 8.50 27.8800

513.79 262.89 513.79 642.23 328.61


H2G2 616.20 197.17 616.20 H2G2 712.53 246.46
35.52 1.18 35.52 1.18
DL DL
199.46 102.33 199.46 249.33 127.91
10.03 0.37 10.03 0.37
LL LL
58.62 29.77 58.62 73.28 37.21
10.89 10.89 10.89 10.89
EL/WL EL/WL
121.39 - 121.39 121.39 -
8.50 27.8800 13.9400 8.50 27.8800

139.05 110.88 139.05 173.81 138.60


H2G3 357.41 83.16 357.41 H2G3 383.49 103.95
13.57 5.67 13.57 5.67
DL DL
55.14 42.79 55.14 68.93 53.49
3.42 2.04 3.42 2.04
LL 14.91 12.86 14.91 LL 18.64 16.08
21.84 21.84 21.84 21.84
EL/WL EL/WL
133.10 - 133.10 133.10 -
6.00 19.6800 9.8400 6.00 19.6800

302.27 283.06 302.27 377.83 353.83


H2G4 497.50 212.30 497.50 H2G4 554.17 265.37
24.27 18.61 24.27 18.61
DL DL
113.71 105.16 113.71 142.14 131.45
7.75 7.12 7.75 7.12
LL LL
37.48 36.19 37.48 46.85 45.24
23.48 23.48 23.48 23.48
EL/WL EL/WL
142.39 - 142.39 142.39 -
6.00 19.6800 9.8400 6.00 19.6800

75.27 (4.01) 22.29 94.09 (5.02)


H2B1 260.97 (3.01) 191.22 H2B1 275.09 (3.76)
7.31 2.07 7.31 2.07
DL 28.03 (3.45) 6.36 DL 35.04 (4.31)
3.58 0.49 3.58 0.49
LL LL
9.57 1.10 4.43 11.96 1.38
19.02 19.02 19.02 19.02
EL/WL EL/WL
107.54 - 91.76 107.54 -
4.00 13.1200 6.5600 4.00 13.1200

278.79 151.57 278.79 348.49 189.46


H2B2 209.09 113.68 209.09 H2B2 261.36 142.10
19.04 - 19.04 -
DL DL
DL 102.46 55.64 102.46 DL 128.08 69.55
6.80 - 6.80 -
LL LL
36.56 19.93 36.56 45.70 24.91
- - - -
EL/WL EL/WL
- - - - -
8.50 27.8800 13.9400 8.50 27.8800

233.20 119.10 233.20 291.50 148.88


H2B3 341.92 89.33 341.92 H2B3 385.64 111.66
19.12 - 19.12 -
DL DL
90.53 46.20 90.53 113.16 57.75
5.63 - 5.63 -
LL LL
26.61 13.62 26.61 33.26 17.03
6.05 6.05 6.05 6.05
EL/WL EL/WL
87.82 - 87.82 87.82 -
8.50 27.8800 13.9400 8.50 27.8800

- - - - -
H2B4 - - - H2B4 - -
- -
DL DL - -
- -
LL LL - -
- -
EL/WL EL/WL - -
- - - - -

251.34 110.39 237.27 314.18 137.99


H2B5 311.76 82.80 301.21 H2B5 358.89 103.50
17.31 - 17.31 -
DL DL
106.18 44.26 98.77 132.73 55.33
3.51 - 3.51 -
LL LL
21.59 11.44 21.59 26.99 14.30
3.36 3.36 3.36 3.36
EL/WL EL/WL
64.81 - 64.81 64.81 -
11.38 37.3264 18.6632 11.38 37.3264

- 577.91 - - 722.39
H2B6 - 433.44 - H2B6 - 541.79
22.68 - 22.68 -
DL - 212.16 - DL - 265.20
8.12 - 8.12 -
LL LL
- 75.98 - - 94.98
- - - -
EL/WL EL/WL
- - - - -
11.38 37.3264 18.6632 11.38 37.3264

402.94 220.92 402.94 503.67 276.15


H2B7 435.75 165.69 435.75 H2B7 511.30 207.11
25.91 - 25.91 -
DL DL
156.83 85.93 156.83 196.04 107.41
7.55 - 7.55 -
LL LL
45.64 25.07 45.64 57.05 31.34
3.77 3.77 3.77 3.77
EL/WL EL/WL
70.22 - 70.22 70.22 -
11.38 37.3264 18.6632 11.38 37.3264
166.02 74.36 166.02 207.53 92.95
HRB1 190.15 55.77 190.15 HRB1 221.28 69.71
10.97 1.79 10.97 1.79
DL DL
59.55 30.50 59.55 74.44 38.13
2.83 1.46 2.83 1.46
LL LL
22.98 7.14 22.98 28.73 8.93
3.11 3.11 3.11 3.11
EL/WL EL/WL
34.51 - 34.51 34.51 -
8.50 27.8800 13.9400 8.50 27.8800

424.24 384.54 424.24 530.30 480.68


HRB1A 377.55 288.41 377.55 HRB1A 457.10 360.51
23.66 4.26 23.66 4.26
DL DL
111.88 91.83 111.88 139.85 114.79
18.68 7.78 18.68 7.78
LL LL
91.90 91.19 91.90 114.88 113.99
2.10 2.10 2.10 2.10
EL/WL EL/WL
31.22 - 31.22 31.22 -
8.50 27.8800 13.9400 8.50 27.8800

148.69 76.36 148.69 185.87 95.45


HRB2 161.44 57.27 161.44 HRB2 189.32 71.58
12.13 0.59 12.13 0.59
DL DL
58.46 30.07 58.46 73.08 37.59
3.37 0.18 3.37 0.18
LL LL
16.36 8.36 16.36 20.45 10.45
1.77 1.77 1.77 1.77
EL/WL EL/WL
26.25 - 26.25 26.25 -
8.50 27.8800 13.9400 8.50 27.8800

246.82 154.19 246.82 308.52 192.73


HRB3 273.09 115.64 273.09 HRB3 319.37 144.55
17.24 0.15 17.24 0.15
DL DL
99.56 62.41 99.56 124.45 78.01
4.31 0.04 4.31 0.04
LL LL
25.08 15.49 25.08 31.35 19.36
2.47 2.47 2.47 2.47
EL/WL EL/WL
46.26 - 46.26 46.26 -
11.38 37.3264 18.6632 11.38 37.3264

- 805.86 - - 1,007.33
HRB3A - 604.40 - HRB3A - 755.50
17.56 - 17.56 -
DL DL
- 164.25 - - 205.31
22.92 - 22.92 -
LL LL
- 214.32 - - 267.90
- - - -
EL/WL - - - EL/WL - -
11.38 37.3264 18.6632 11.38 37.3264

513.35 318.56 513.35 641.69 398.20


HRB3B 446.31 238.92 446.31 HRB3B 542.56 298.65
17.91 0.35 17.91 0.35
DL DL
106.74 63.40 106.74 133.43 79.25
23.31 0.39 23.31 0.39
LL LL
134.79 85.98 134.79 168.49 107.48
1.69 1.69 1.69 1.69
EL/WL EL/WL
EL/WL 32.23 - 32.23 EL/WL 32.23 -
11.38 37.3264 18.6632 11.38 37.3264

160.33 71.28 160.33 200.42 89.10


HRB4 174.68 53.46 174.68 HRB4 204.74 66.82
10.70 0.99 10.70 0.99
DL DL
44.18 25.38 44.18 55.23 31.73
4.68 0.85 4.68 0.85
LL LL
33.17 10.02 33.17 41.46 12.53
4.49 4.49 4.49 4.49
EL/WL EL/WL
28.62 - 28.62 28.62 -
6.00 19.6800 9.8400 6.00 19.6800

92.31 (37.10) 92.31 115.39 (46.38)


HRB5 122.98 (27.83) 122.98 HRB5 140.29 (34.78)
3.64 1.01 3.64 1.01
DL DL
18.33 (6.15) 18.33 22.91 (7.69)
2.92 2.92 -
LL 24.95 (11.03) 24.95 LL 31.19 (13.79)
4.86 4.86 4.86 4.86
EL/WL EL/WL
28.26 - 28.26 28.26 -
4.00 13.1200 6.5600 4.00 13.1200

77.66 75.92 77.66 97.08 94.90


B1 161.02 56.94 161.02 B1 175.58 71.18
7.63 - 7.63 -
DL DL
26.35 26.60 26.35 32.94 33.25
3.46 - 3.46 -
LL LL
11.99 11.03 11.99 14.99 13.79
8.76 8.76 8.76 8.76
EL/WL EL/WL
54.04 - 54.04 54.04 -
6.00 19.6800 9.8400 6.00 19.6800

80.52 42.50 80.52 100.65 53.13


B2 94.85 31.88 94.85 B2 109.95 39.85
7.74 - 7.74 -
DL DL
27.42 14.46 27.42 34.28 18.08
3.50 - 3.50 -
LL LL
12.35 6.53 12.35 15.44 8.16
1.76 1.76 1.76 1.76
EL/WL 18.12 - 18.12 EL/WL 18.12 -
6.00 19.6800 9.8400 6.00 19.6800

- 136.55 - - 170.68
B3 20.46 102.41 20.46 B3 20.46 128.01
8.28 4.68 8.28 4.68
DL DL
- 41.63 - - 52.04
5.24 2.52 5.24 2.52
LL LL
- 24.95 - - 31.19
1.67 1.67 1.67 1.67
EL/WL EL/WL
10.76 - 10.76 10.76 -
3.92 12.8576 6.4288 3.92 12.8576

12.90 55.80 12.90 16.13 69.75


B4 259.48 41.85 259.48 B4 261.90 52.31
5.33 - 5.33 -
DL DL
4.66 18.32 4.66 5.83 22.90
2.70 - 2.70 -
LL LL
1.76 9.12 1.76 2.20 11.40
10.22 10.22 10.22 10.22
EL/WL EL/WL
131.35 - 131.35 131.35 -
3.92 12.8576 6.4288 3.92 12.8576

- - - - -
CB1 - - - CB1 - -
14.51 16.71 14.51 16.71
DL DL - -
6.62 7.27 6.62 7.27
LL LL - -
- -
EL/WL EL/WL - -
1.96 6.4288 3.2144 1.96 6.4288

- - - - -
CB2 - - - CB2 - -
1.75 5.75 1.75 5.75
DL DL - -
1.48 3.42 1.48 3.42
LL LL - -
- -
EL/WL EL/WL - -
1.51 4.9528 2.4764 1.51 4.9528

13.11 - 13.11 16.38 -


TB1 70.67 - 70.67 TB1 73.13 -
0.42 0.42 0.42 0.42
DL 4.16 - 4.16 DL 5.20 -
0.23 0.23 0.23 0.23
LL LL
2.26 - 2.26 2.83 -
3.25 3.25 3.25 3.25
EL/WL EL/WL
31.99 - 31.99 31.99 -
6.00 19.6800 9.8400 6.00 19.6800

8.56 - 8.56 10.70 -


TB2 349.28 - 349.28 TB2 350.88 -
0.95 0.95 0.95 0.95
DL DL
3.04 - 3.04 3.80 -
0.38 0.38 0.38 0.38
LL LL
1.21 - 1.21 1.51 -
56.08 56.08 56.08 56.08
EL/WL EL/WL
180.28 - 180.28 180.28 -
1.96 6.4288 3.2144 1.96 6.4288
574.41
619.24
-
221.04
-
67.15
-
99.08
13.9400

642.23
712.53
-
249.33
-
73.28
-
121.39
13.9400

173.81
383.49
-
68.93
-
18.64
-
133.10
9.8400

377.83
554.17
-
142.14
-
46.85
-
142.39
9.8400

27.86
195.40
-
7.95
-
5.54
-
91.76
6.5600

348.49
261.36
-
128.08
-
45.70
-
-
13.9400

291.50
385.64
-
113.16
-
33.26
-
87.82
13.9400

-
-
-
-
-
-
-
-
-

296.59
345.70
-
123.46
-
26.99
-
64.81
18.6632

-
-
-
-
-
-
-
-
18.6632

503.67
511.30
-
196.04
-
57.05
-
70.22
18.6632
207.53
221.28
-
74.44
-
28.73
-
34.51
13.9400

530.30
457.10
-
139.85
-
114.88
-
31.22
13.9400

185.87
189.32
-
73.08
-
20.45
-
26.25
13.9400

308.52
319.37
-
124.45
-
31.35
-
46.26
18.6632

-
-
-
-
-
-
-
-
18.6632

641.69
542.56
-
133.43
-
168.49
-
32.23
18.6632

200.42
204.74
-
55.23
-
41.46
-
28.62
9.8400

115.39
140.29
-
22.91
-
31.19
-
28.26
6.5600

97.08
175.58
-
32.94
-
14.99
-
54.04
9.8400

100.65
109.95
-
34.28
-
15.44
-
18.12
9.8400

-
20.46
-
-
-
-
-
10.76
6.4288

16.13
261.90
-
5.83
-
2.20
-
131.35
6.4288

-
-
-
-
-
-
-
-
3.2144

-
-
-
-
-
-
-
-
2.4764

16.38
73.13
-
5.20
-
2.83
-
31.99
9.8400

10.70
350.88
-
3.80
-
1.51
-
180.28
3.2144
PROJECT : PROPOSED GULLAS RAMP
LOCATION : BANILAD, MANDAUE CITY
DATE : MAY 25, 2005

43.50 76.18 43.50 54.38 95.22


B1 93.83 57.13 93.83 B1 101.98 71.42
3.90 - 3.90 -
DL DL
16.14 18.95 16.14 20.18 23.69
1.71 - 1.71 -
LL LL
5.58 17.44 5.58 6.98 21.80
5.11 5.11 5.11 5.11
EL/WL 32.18 - 32.18 EL/WL 32.18 -
3.90 12.7920 6.3960 3.90 12.7920

216.24 695.21 216.24 270.30 869.02


B2 409.09 521.41 409.09 B2 449.63 651.76
37.09 13.95 37.09 13.95
DL DL
72.11 231.51 72.11 90.14 289.39
16.49 8.24 16.49 8.24
LL LL
34.42 110.93 34.42 43.03 138.66
5.45 5.45 5.45 5.45
EL/WL EL/WL
129.83 - 129.83 129.83 -
7.84 25.7152 12.8576 7.84 25.7152

28.76 45.33 28.76 35.94 56.67


B3 96.95 34.00 96.95 B3 102.35 42.50
4.65 - 4.65 -
DL DL
7.23 14.59 7.23 9.04 18.24
3.82 - 3.82 -
LL 6.52 7.65 6.52 LL 8.15 9.56
3.15 3.15 3.15 3.15
EL/WL EL/WL
39.64 - 39.64 39.64 -
3.84 12.5952 6.2976 3.84 12.5952

89.97 36.80 89.97 112.46 46.00


B4 67.48 27.60 67.48 B4 84.35 34.50
7.60 - 7.60 -
DL DL
31.96 13.07 31.96 39.95 16.34
3.02 - 3.02 -
LL LL
12.71 5.20 12.71 15.89 6.50
- - - -
EL/WL EL/WL
- - - - -
3.84 12.5952 6.2976 3.84 12.5952

275.20 (56.04) 275.20 344.00 (70.05)


B5 361.98 (42.03) 361.98 B5 413.58 (52.54)
12.34 - 12.34 -
DL 99.22 (19.44) 99.22 DL 124.03 (24.30)
4.52 - 4.52 -
LL LL
37.67 (8.30) 37.67 47.09 (10.38)
13.44 13.44 13.44 13.44
EL/WL EL/WL
81.81 - 81.81 81.81 -
6.00 19.6800 9.8400 6.00 19.6800

345.06 341.88 345.06 431.33 427.35


B6 304.61 256.41 304.61 B6 369.31 320.51
20.18 - 20.18 -
DL DL
DL 124.50 125.25 124.50 DL 155.63 156.56
7.37 - 7.37 -
LL LL
47.16 45.16 47.16 58.95 56.45
0.61 0.61 0.61 0.61
EL/WL EL/WL
24.09 - 24.09 24.09 -
12.00 39.3600 19.6800 12.00 39.3600

258.13 (33.96) 258.13 322.66 (42.45)


B7 267.78 (25.47) 267.78 B7 316.18 (31.84)
13.39 - 13.39 -
DL DL
94.26 (11.60) 94.26 117.83 (14.50)
4.82 - 4.82 -
LL LL
34.35 (5.18) 34.35 42.94 (6.48)
3.87 3.87 3.87 3.87
EL/WL EL/WL
39.01 - 39.01 39.01 -
6.00 19.6800 9.8400 6.00 19.6800

442.76 255.67 441.24 553.45 319.59


B8 348.04 191.75 346.90 B8 431.06 239.69
21.09 - 21.09 -
DL DL
160.65 94.46 160.65 200.81 118.08
7.69 - 7.69 -
LL LL
59.77 33.12 59.11 74.71 41.40
0.21 0.21 0.21 0.21
EL/WL EL/WL
8.40 8.40 8.40 -
12.00 39.3600 19.6800 12.00 39.3600

- - - - -
CB1 - - - CB1 - -
32.66 35.57 32.66 35.57
DL DL
- - - - -
11.95 12.01 11.95 12.01
LL LL
- - - - -
- - - -
EL/WL EL/WL
- - - - -
1.92 6.2976 3.1488 1.92 6.2976

- - - - -
CB2 - - - CB2 - -
10.22 13.12 10.22 13.12
DL - - - DL - -
4.00 4.06 4.00 4.06
LL LL
- - - - -
- - - -
EL/WL EL/WL
- - - - -
1.92 6.2976 3.1488 1.92 6.2976

21.54 387.85 21.54 26.93 484.82


TB1 305.85 290.89 305.85 TB1 309.89 363.61
19.85 16.12 19.85 16.12
DL DL
6.89 144.32 6.89 8.61 180.40
6.62 6.62 6.62 6.62
LL LL
3.67 49.40 3.67 4.59 61.75
11.85 11.85 11.85 11.85
EL/WL EL/WL
152.33 - 152.33 152.33 -
7.84 25.7152 12.8576 7.84 25.7152
9.91 - 9.91 12.39 -
TB2 81.07 - 81.07 TB2 82.93 -
0.56 0.56 0.56 0.56
DL DL
3.52 - 3.52 4.40 -
0.22 0.22 0.22 0.22
LL LL
1.40 - 1.40 1.75 -
6.15 6.15 6.15 6.15
EL/WL EL/WL
38.72 - 38.72 38.72 -
3.84 12.5952 6.2976 3.84 12.5952

68.05 - 68.05 85.07 -


TB3 261.04 - 261.04 TB3 273.80 -
2.50 2.50 2.50 2.50
DL DL
24.58 - 24.58 30.73 -
0.94 0.94 0.94 0.94
LL LL
9.28 - 9.28 11.60 -
11.22 11.22 11.22 11.22
EL/WL EL/WL
110.42 - 110.42 110.42 -
6.00 19.6800 9.8400 6.00 19.6800
54.38
101.98
-
20.18
-
6.98
-
32.18
6.3960

270.30
449.63
-
90.14
-
43.03
-
129.83
12.8576

35.94
102.35
-
9.04
-
8.15
-
39.64
6.2976

112.46
84.35
-
39.95
-
15.89
-
-
6.2976

344.00
413.58
-
124.03
-
47.09
-
81.81
9.8400

431.33
369.31
-
155.63
-
58.95
-
24.09
19.6800

322.66
316.18
-
117.83
-
42.94
-
39.01
9.8400

551.55
429.64
-
200.81
-
73.89
-
8.40
19.6800

-
-
-
-
-
-
-
-
3.1488

-
-
-
-
-
-
-
-
3.1488

26.93
309.89
-
8.61
-
4.59
-
152.33
12.8576
12.39
82.93
-
4.40
-
1.75
-
38.72
6.2976

85.07
273.80
-
30.73
-
11.60
-
110.42
9.8400
Project : PROPOSED HOSPITAL BUILDING
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G1 35 65 8.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G2 35 65 8.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G3 30 60 6.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G4 30 60 6.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 12 @ 5, 4 @ 10 Conventional
H-2B1 30 55 3.20 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-2B2 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 3 - 20 mm 6 - 20 mm 10 @ 5, 5 @ 10 Post-Tension
H-2B3 30 55 8.50 -
bottom 4 - 20 mm 3 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-2B5 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-2B6 30 60 11.38 2-16mm
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-2B7 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G1 35 65 8.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G2 35 65 8.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G3 30 60 6.00 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G4 30 60 6.00 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 12 @ 5, 4 @ 10 Conventional
H-3B1 30 55 3.20 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-3B2 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 3 - 20 mm 5 - 20 mm 10 @ 5, 5 @ 10 Post-Tension
H-3B3 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-3B5 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-3B6 30 60 11.38 2-16mm
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-3B7 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB1 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB1A 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 6 @ 10 Conventional
H-RB2 25 50 8.50 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 6 @ 10 Conventional
H-RB3 30 60 11.38 2-16mm
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB3A 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB3B 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Conventional
H-RB4 30 50 6.00 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 3 - 16 mm 3 - 16 mm 5 @ 10 Conventional
LB1 20 40 3.33 -
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam

Page 17 of 22
Project : PROPOSED HOSPITAL BUILDING
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS (HOSPITAL RAMP)
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 10 @ 5 , 4 @ 10 Conventional
B1 25 45 6.00 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 2 @ 10 Conventional
B2 25 45 6.00 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 10 @ 5 , 4 @ 10 Conventional
B3 25 45 3.92 -
bottom 3 - 20 mm 5 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
B4 25 55 3.92 -
bottom 5 - 20 mm 3 - 20 mm 5 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 5 - 25 mm 5 - 25 mm 5 @ 5, 5 @ 10 Conventional
CB1 30 55 1.96 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Conventional
CB2 25 45 1.51 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 20 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 8 @ 5, 4 @ 10 Conventional
TB1 25 35 6.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 3 - 25 mm 5 - 25 mm 14 @ 5 , 5 @ 10 Conventional
TB2 30 55 1.96 -
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam

Page 18 of 22
Project : PROPOSED HOSPITAL BUILDING
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS (HOSPITAL RAMP)
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 10 @ 5 , 4 @ 10 Conventional
B1 25 40 3.90 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 20 mm 16 @ 5 , 5 @ 10 , 4 @ 23 Conventional
B2 35 75 7.84 2 - 16mm
bottom 3 - 25 mm 7 - 25 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 12 @ 5 , 4 @ 10 Conventional
B3 30 60 3.84 2 - 16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 4 @ 10 Conventional
B4 20 40 3.84 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 13 @ 5 , 5 @ 10 Conventional
B5 30 60 6.00 2 - 16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 13 @ 5 , 6 @ 10 Conventional
B6 30 60 12.00 2 - 16mm
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 13 @ 5, 2 @ 10 Conventional
B7 30 60 6.00 2 - 16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 6 @ 10 Conventional
B8 30 65 12.00 2 - 16mm
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
B9 20 40 1.62 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 7 - 25 mm 7 - 25 mm 5 @ 5, 5 @ 10 Conventional
CB1 35 70 1.92 2 - 16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 14 cm O.C. Beam
top 4 - 25 mm 4 - 25 mm 4 - 25 mm 5 @ 5 , 5 @ 10 Conventional
CB2 30 60 1.92 2 - 16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 14 @ 5, 4 @ 10 Conventional
TB1 30 65 7.84 2 - 16mm
bottom 4 - 25 mm 6 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 10 @ 5, 4 @ 10 Conventional
TB2 25 40 3.84 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5, 4 @ 10 Conventional
TB3 30 50 6.00 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam

Page 19 of 22
Project : PROPOSED HOSPITAL BUILDING
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G1 35 65 8.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G2 35 65 8.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G3 30 60 6.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-2G4 30 60 6.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 12 @ 5, 4 @ 10 Conventional
H-2B1 30 55 3.20 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-2B2 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 3 - 20 mm 6 - 20 mm 10 @ 5, 5 @ 10 Post-Tension
H-2B3 30 55 8.50 -
bottom 4 - 20 mm 3 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-2B5 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-2B6 30 60 11.38 2-16mm
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-2B7 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G1 35 65 8.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G2 35 65 8.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G3 30 60 6.00 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-3G4 30 60 6.00 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 12 @ 5, 4 @ 10 Conventional
H-3B1 30 55 3.20 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-3B2 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 3 - 20 mm 5 - 20 mm 10 @ 5, 5 @ 10 Post-Tension
H-3B3 30 55 8.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-3B5 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
H-3B6 30 60 11.38 2-16mm
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
H-3B7 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB1 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
H-RB1A 30 55 8.50 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 6 @ 10 Conventional
H-RB2 25 50 8.50 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 6 @ 10 Conventional
H-RB3 30 60 11.38 2-16mm
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 3 - 25 mm 3 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
H-RB3A 30 60 11.38 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 3 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
H-RB3B 30 60 11.38 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Conventional
H-RB4 30 50 6.00 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 3 - 16 mm 3 - 16 mm 5 @ 10 Conventional
LB1 20 40 3.33 -
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam

Page 20 of 22
Project : PROPOSED HOSPITAL BUILDING
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS (REVISED 5/12/05)
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 22 Conventional
H-RB1A 30 65 8.50 2 - 16mm
bottom 2 - 25 mm 7 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 3 - 25 mm 3 - 25 mm 5 @ 5 , 5 @ 10 Post Tension
H-RB3A 30 60 11.38 2 - 16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 3 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post Tension
H-RB3B 30 60 11.38 2 - 16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam

Page 21 of 22
Project : PROPOSED HOSPITAL BUILDING (REVISION 1)
Location : Banilad, Mandaue City
Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 4 @ 10 Conventional
TB1 25 50 4.84 -
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 4 @ 10 Conventional
TB2 30 60 8.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 4 @ 10 Conventional
TB3 30 60 8.50 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 4 @ 10 Conventional
TB4 30 50 8.50 -
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5, 6 @ 10 Conventional
TB5 25 50 11.38 -
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB6 30 60 11.38 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5, 4 @ 10 Conventional
TB7 30 50 6.00 -
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB8 30 60 11.38 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam

Page 22 of 22