Project : PROPOSED MEDICAL SCHOOL BUILDING

Location : Banilad, Mandaue City


Owner : UNIVERSITY OF THE VISAYAS
Architect : Manuel Ar. Guanzon
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 40,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 10 - 25 mm 3 - 25 mm 10 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G1 35 70 7.00 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2G2 30 60 7.00 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 3 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G3 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G4 40 70 9.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 3 - 25 mm 5 - 25 mm 12 @ 5, 5 @ 10 Post-Tension
2G5 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 3 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G6 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5, 4 @ 10 Conventional
2B1 35 70 7.00 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 28 Conventional
2B2 35 70 4.00 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 14 @ 5 , 4 @ 10 Conventional
2B3 35 70 4.00 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2B4 35 60 4.00 2-16mm
bottom 7 - 25 mm 2 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2B5 35 60 7.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 5 @ 10 Conventional
2B6 35 60 7.00 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
2B7 30 50 7.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 3 - 20 mm 4 - 20 mm 10 @ 5 , 5 @ 10 Post-Tension
2B8 30 50 7.00 -
bottom 4 - 20 mm 3 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Conventional
2B9 25 50 7.00 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 17 Conventional
2B10 35 70 5.25 2-16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 23 Conventional
2B11 35 70 5.25 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5, 5 @ 10 Post-Tension
2B12 30 55 9.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B13 35 70 3.00 2-16mm
bottom 10 - 25 mm 2 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B14 35 70 9.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 9 @ 5 , 5 @ 10 Post-Tension
2B15 40 70 2.00 2-16mm
bottom 12 - 25 mm 2 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
2B16 20 40 4.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B17 35 70 3.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B18 35 70 9.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B19 35 70 3.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 4 @ 10 Post-Tension
2B20 35 70 9.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 14 @ 5 , 4 @ 10 Conventional
2B21 35 70 5.25 2-16mm

Page 1 of 4
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 40,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
2B21 35 70 5.25 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 3 - 25 mm 10 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G1 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3G2 30 60 7.00 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 3 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G3 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G4 35 70 9.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 4 @ 10 Conventional
3B1 35 70 7.00 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 4 @ 10 , 3 @ 25 Conventional
3B2 35 65 4.00 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 4 @ 10 , 3 @ 26 Conventional
3B3 35 70 4.00 2-16mm
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 4 @ 10 Conventional
3B4 30 60 4.00 2-16mm
bottom 7 - 25 mm 2 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Conventional
3B5 30 60 7.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 10 @ 5 , 4 @ 10 Conventional
3B6 25 50 7.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 17 Conventional
3B7 35 70 5.25 2-16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 4 @ 10 Conventional
3B8 35 70 5.25 2-16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
3B9 30 55 9.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
3B10 35 70 3.00 2-16mm
bottom 10 - 25 mm 2 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
3B11 35 70 9.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
3B12 35 70 3.00 2-16mm
bottom 10 - 25 mm 2 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
3B13 20 40 4.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
3B14 35 60 7.00 2-16mm
bottom 3 - 25 mm 4 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 3 - 25 mm 9 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
4G1 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
4G2 30 60 7.00 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 3 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
4G3 35 70 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
4G4 35 70 9.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 14 @ 5 , 3 @ 10 Conventional
4B1 35 70 7.00 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 4 @ 10 , 3 @ 26 Conventional
4B2 35 60 4.00 2-16mm
bottom 6 - 25 mm 2 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 4 @ 10 Conventional
4B3 35 70 4.00 2-16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
4B4 30 60 4.00 2-16mm
bottom 6 - 25 mm 2 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Conventional
4B5 30 60 7.00 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 19 Conventional
4B6 35 70 5.25 2-16mm
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam

Page 2 of 4
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 40,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 18 Conventional
4B7 35 70 5.25 2-16mm
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
4B8 30 55 9.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
4B9 35 70 3.00 2-16mm
bottom 9 - 25 mm 2 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
4B10 35 70 9.00 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
4B11 35 70 3.00 2-16mm
bottom 8 - 25 mm 2 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
4B12 20 40 4.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 3 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG1 35 60 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDG2 30 60 7.00 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 3 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG3 35 60 7.00 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG4 35 60 9.00 2-16mm
bottom 4 - 25 mm 6 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
RDB1 35 60 7.00 2-16mm
bottom 5 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 8 @ 5 , 4 @ 10 Conventional
RDB2 25 40 4.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 4 @ 10 Conventional
RDB3 25 50 4.00 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 3 @ 10 Conventional
RDB4 25 50 4.00 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Conventional
RDB5 25 50 7.00 -
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 4 @ 10 Conventional
RDB6 30 55 5.25 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 4 @ 10 Conventional
RDB7 30 55 5.25 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 3 - 20 mm 3 - 20 mm 5 @ 5 , 5 @ 10 Post-Tension
RDB8 30 55 9.00 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
RDB9 30 55 3.00 -
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
RDB10 30 55 9.00 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
RDB11 30 55 3.00 -
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
RDB12 20 40 4.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 17 Conventional
SB1 40 75 4.00 2-16mm
bottom 10 - 25 mm 3 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 4 @ 5 , 4 @ 10 Conventional
SB2 25 45 3.11 -
bottom 2 - 25 mm 4 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 4 @ 10 , 3 @ 29 Conventional
WB1 30 50 4.00 -
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 4 @ 10 Conventional
WB2 30 50 4.00 -
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 4 @ 10 , 4 @ 23 Conventional
WG1 30 60 5.25 2-16mm
bottom 3 - 25 mm 6 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5 , 5 @ 10 Conventional
MRB1 25 50 7.00 -
bottom 2 - 25 mm 4 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 5 @ 10 Conventional
MRB2 20 40 7.00 -

Page 3 of 4
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 40,000 Psi Fvy = 40,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
MRB2 20 40 7.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 4 @ 5 , 4 @ 10 Conventional
MRB3 25 50 5.00 -
bottom 3 - 20 mm 5 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam