SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
Beam 10mm stirrups
Width (cm) Depth (cm) Span (m) Left Support Midspan Right Support Stiffener Remarks
Designation (2-legs)
top 4 - 25 mm 2 - 25 mm 8 - 25 mm 11 @ 5, 6 @ 10 Conventional
RB9 30 60 11.25 2-16mm
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 4 - 25 mm 11 @ 5, 4 @ 10 Conventional
RB9A 30 60 7.05 2-16mm
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 10 @ 5, 4 @ 10 Conventional
RB20 30 50 8.40 -
bottom 2 - 25 mm 4 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 8 @ 5, 4 @ 10 Conventional
TPB1 25 40 3.00 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 9 @ 5, 4 @ 10 Conventional
TPB2 25 45 4.00 -
bottom 3 - 25 mm 4 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
EB1 20 40 6.00 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 5 - 25 mm 5 - 25 mm 5 @ 5, 4 @ 10 Conventional
ECB1 30 50 3.00 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
Page 2 of 2