Project : PROPOSED APARTMENT BUILDING

Location : Acacia St., Lahug, Cebu City


Owner : BENEDICT QUE
Architect : Manuel Ar. Guanzon

SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
LG-B1 30 60 4.20 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 4 @ 10 Conventional
LG-B2 25 40 4.26 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 10 @ 5 , 4 @ 10 Conventional
LG-B3 25 50 3.23 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 4 @ 10 Conventional
LG-B4 30 60 3.23 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
LG-B5 25 40 3.23 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
LG-G1 40 70 11.50 2-16mm
bottom 4 - 25 mm 5 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 14 @ 5, 4 @ 10 Conventional
RMB1 35 65 4.26 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
RMB2 25 45 4.26 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RMG1 30 55 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
UG-B1 30 60 6.50 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 4 @ 10 , 4 @ 26 Conventional
UG-B2 35 65 6.50 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
UG-B3 30 60 4.20 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
UG-B4 35 65 11.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
UG-B5 30 60 4.20 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
UG-B6 30 60 11.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
UG-B7 30 60 4.20 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
UG-B8 30 55 7.80 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
UG-B9 20 40 3.70 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 10 @ 5 , 4 @ 10 Conventional
UG-B10 20 40 3.00 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 10 @ 5 , 4 @ 10 Conventional
UG-B11 25 40 8.40 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 4 @ 7 , 4 @ 10 Conventional
UG-B12 35 65 2.20 2-16mm
bottom 5 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G1 35 70 11.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 1 @ 10 Conventional
UG-G2 30 60 6.50 2-16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G3 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G4 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G5 35 70 11.90 2-16mm
bottom 4 - 25 mm 4 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
UG-G6 35 70 8.40 2-16mm

Page 1 of 6
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
UG-G6 35 70 8.40 2-16mm
bottom 4 - 25 mm 4 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G7 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
UG-G8 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 Conventional
2B1 35 70 6.50 2-16mm
bottom 5 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 14 @ 5 , 5 @ 10 , 4 @ 25 Conventional
2B2 35 70 6.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
2B3 35 70 11.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2B4 30 60 11.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2B5 30 50 7.55
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 10 @ 5 , 4 @ 10 Conventional
2B6 25 50 3.95 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 3 - 20 mm 10 @ 5 , 5 @ 10 Conventional
2B7 25 50 7.55 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 14 @ 5 , 4 @ 7 , 4 @ 10 Conventional
2B8 35 65 2.20 2-16mm
bottom 5 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G1 35 70 11.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G2 35 70 11.50 2-16mm
bottom 4 - 25 mm 4 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G3 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G4 35 70 6.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G5 35 70 11.90 2-16mm
bottom 6 - 25 mm 4 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2G6 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G7 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
2G8 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 4 @ 10 Conventional
EB1 20 50 3.25 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
EB2 20 40 3.25 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 3 - 25 mm 3 - 25 mm 4 @ 5 , 4 @ 10 Conventional
2CB1 25 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2CB2 30 60 2.26 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2CB3 30 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2CB4 30 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
2CB5 30 60 3.00 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 Conventional
3B1 35 65 6.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 , 4 @ 28 Conventional
3B2 35 70 6.50 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3B3 35 70 11.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam

Page 2 of 6
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3B4 30 60 11.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3B5 30 50 7.80 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 10 @ 5 , 4 @ 10 Conventional
3B6 25 50 4.70 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 6 @ 7 , 5 @ 11 Conventional
3B7 35 65 2.20 2-16mm
bottom 5 - 25 mm 2 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Conventional
3B8 35 70 9.00 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G1 35 70 11.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G2 35 70 11.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G3 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G4 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G5 35 70 11.90 2-16mm
bottom 6 - 25 mm 4 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3G6 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G7 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
3G8 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 3 - 25 mm 3 - 25 mm 4 @ 5 , 4 @ 10 Conventional
3CB1 25 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3CB2 30 60 2.26 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
3CB3 30 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 4 @ 5 , 4 @ 10 Conventional
3CB4 25 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 Conventional
5B1 35 65 6.50 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 Conventional
5B2 35 70 6.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
5B3 35 70 11.50 2-16mm
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
5B4 30 60 11.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
5B5 30 50 7.80 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 2 - 25 mm 10 @ 5 , 4 @ 10 Conventional
5B6 25 50 3.70 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 4 @ 10 , 3 @ 15 Conventional
5B7 30 50 2.20 -
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G1 35 70 11.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G2 35 70 11.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G3 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G4 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G5 35 70 11.90 2-16mm

Page 3 of 6
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
5G5 35 70 11.90 2-16mm
bottom 6 - 25 mm 4 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
5G6 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G7 35 70 8.40 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
5G8 35 70 6.50 2-16mm
bottom 4 - 25 mm 3 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 5 @ 10 Conventional
RDB1 30 55 6.50 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 14 @ 5 , 5 @ 10 , 4 @ 20 Conventional
RDB2 35 70 6.50 2-16mm
bottom 2 - 25 mm 3 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Post-Tension
RDB3 30 60 11.50 2-16mm
bottom 3 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDB4 30 60 11.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 2 - 25 mm 3 - 25 mm 10 @ 5 , 4 @ 10 Conventional
RDB5 25 50 3.70 -
bottom 2 - 25 mm 2 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDB6 30 50 7.80 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 5 @ 10 Conventional
RDB6A 20 40 5.50 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 10 @ 5 , 4 @ 10 Conventional
RDB7 25 40 2.20 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
RDB8 25 40 5.15 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
RDB9 20 40 3.25 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG1 35 70 11.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG2 35 70 11.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG3 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG4 35 70 6.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG5 35 70 11.90 2-16mm
bottom 5 - 25 mm 4 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDG6 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG7 35 70 8.40 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 5 @ 10 Post-Tension
RDG8 35 70 6.50 2-16mm
bottom 3 - 25 mm 3 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 3 - 25 mm 3 - 25 mm 3 - 25 mm 4 @ 5 , 4 @ 10 Conventional
RDCB1 25 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDCB2 30 60 2.26 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDCB3 30 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 2 - 25 mm 2 - 25 mm 2 - 25 mm 5 @ 5 , 5 @ 10 Post-Tension
RDCB4 30 50 2.26 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 5 @ 10 Conventional
RB1 25 50 6.50 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 10 @ 5 , 5 @ 10 Conventional
RB2 25 50 6.50 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 6 @ 10 Conventional
RB3 25 55 11.50 -
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam

Page 4 of 6
SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 6 @ 10 Conventional
RB4 25 50 11.50 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 10 @ 5 , 3 @ 10 Conventional
RB5 25 50 3.25 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 3 @ 10 Conventional
RB6 25 50 6.50 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 2 - 25 mm 14 @ 5 , 5 @ 10 Conventional
RB7 35 65 6.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 5 - 25 mm 14 @ 5 , 6 @ 10 Conventional
RB8 35 65 9.70 2-16mm
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 5 - 25 mm 2 - 25 mm 2 - 25 mm 14 @ 5 , 4 @ 10 Conventional
RB9 35 65 6.50 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 5 @ 10 Conventional
RB10 25 50 6.50 -
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 5 - 20 mm 5 - 20 mm 4 @ 5 , 4 @ 10 Conventional
RCB1 25 50 2.26 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 20 cm O.C. Beam
top 6 - 25 mm 6 - 25 mm 6 - 25 mm 4 @ 5 , 4 @ 10 Conventional
RCB2 30 60 2.26 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 6 - 25 mm 6 - 25 mm 6 - 25 mm 4 @ 5 , 4 @ 10 Conventional
RCB3 35 65 3.25 2-16mm
bottom 2 - 25 mm 2 - 25 mm 2 - 25 mm rest @ 20 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 12 @ 5 , 4 @ 10 , 4 @ 22 Conventional
WG1 30 60 5.00 2-16mm
bottom 2 - 25 mm 5 - 25 mm 2 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 10 @ 5 , 3 @ 10 Conventional
WB1 25 50 2.20 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
WB2 25 40 2.20 -
bottom 3 - 20 mm 3 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 4 @ 10 Conventional
LB1 20 40 3.25 -
bottom 2 - 20 mm 2 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 8 @ 5 , 4 @ 10 Conventional
SB1 20 40 2.00 -
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam

Page 5 of 6
Project : PROPOSED APARTMENT BUILDING
Location : Acacia St., Lahug, Cebu City
Owner : BENEDICTO QUE
Architect : Manuel Ar. Guanzon

SCHEDULE OF BEAMS
Fc' = 4,000 Psi Fy = 60,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 4 - 20 mm 4 - 20 mm 4 - 20 mm 10 @ 5 , 4 @ 10 Conventional
TB1 25 40 4.20 -
bottom 4 - 20 mm 4 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 3 - 25 mm 6 - 25 mm 15 @ 5 , 5 @ 10 Conventional
TB2 35 70 6.50 2-16mm
bottom 6 - 25 mm 3 - 25 mm 6 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 3 - 25 mm 10 - 25 mm 17 @ 5 , 6 @ 10 Conventional
TB3 40 80 11.50 2-16mm
bottom 10 - 25 mm 3 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 3 - 25 mm 12 - 25 mm 18 @ 5 , 6 @ 10 Conventional
TB4 40 90 11.50 4-16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 4 - 25 mm 4 - 25 mm 10 @ 5, 5 @ 10 Conventional
TB5 30 50 6.50 2-16mm
bottom 4 - 25 mm 4 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 5 @ 10 Conventional
TB6 30 50 3.23 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 3 - 25 mm 10 - 25 mm 17 @ 5, 5 @ 10 Conventional
TB7 40 80 6.50 2-16mm
bottom 10 - 25 mm 3 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 4 - 25 mm 2 - 25 mm 4 - 25 mm 10 @ 5 , 4 @ 10 Conventional
TB8 30 50 2.20 -
bottom 4 - 25 mm 2 - 25 mm 4 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 3 - 25 mm 8 - 25 mm 11 @ 5 , 5 @ 10 Conventional
TB9 40 70 6.50 -
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam