Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

2 Checklist Form No.

:
Welding Machine & Rev No.:
Inverter Welding Date :
Inspection Page :
5
Contractor Name: PT GBE Assessors Name: Date Juli 2016

Manufacture / Merk: Model:

Tag No : S/N

No. Checks Good No Good N/A Remarks

1. Switch on/off/Tombol On / Off

52 Electrical Installation / Instalasi Listrik


3 Fan cooler/Kips pendingin
4. Socket cable welding/sambungan kabel las

5. Cable welding insulation / Isolasi kabel las


6 Cable Welding Condition / Kondisi kabel Las
7. Stick holder/ Pemegang stik las
8. Socket cable power/sambungan kabel power

9. Cable power insulation/Isolasi kabel Listrik

10. Ground welding holder/Grounding Stik Las

11 Casing /Rumah Alat Las

12. Equipment holder/Pegangan Alat Unit Las

13. Indicator /Penunjuk

14 Amphere level switch/Tombol Amper

15 Body Grounding / Anti Petir Mesin Las

Comment :

Tools

Complying Not complying

..
Assessors Signature Date

Photo

You might also like