MANAGEMENT ASSOICATES

MONTHLY PROGRESS REPORT

REPORT NO. 8 PERIOD COVERED 1st July TO 31st July

NAME : Talha Jamil DATE: 05-08-2016


DESIGNATION : Management Associate

P. NO.: 2456 APP. BATCH: 21 TO : Unit Manager L & D

SECTION / DEPTT. Opr. (Ammonia ) THRU : __________ __________


UM / Sec. Head Deptt. Mngr.
Description of Activities
During month of July following activities were performed :
Line tracing of following circuits were performed
1. HS circuit
2. MS circuit
3. MS circuit
4. Vacuum condensate circuit
5. DMW circuit
6.V-405 fuel gas circuit
7. Cold and hot vent circuit
8. Nitrogen header distribution
9. E-101A/B, E-201, E-322A/B, HRSG Blowdown network (BBD)
Detailed study and discussion with Shift Incharge on Start-Up of Reformer section.
Study of work instructions of Benfield Start-Up.
Discussed Interlocks I-1, I-2, I-3, I-4, I-4A, I-4B, I-4C, I-5A, I-5B, I-5C, I-6
Area duty at Reforming section under coverage of area operator.
Area duty at Benfield section under coverage of area operator.

Activities during area duty:


Participation in job activities
1st Hour and Log sheets filling
Routine audits of respective area
Discussion on Start-up procedure
Discussion on interlocks in the respective area
Conducting Safety talk

SIP courses on;


1. WORKPLACE SAFETY
2. VALVES AND THEIR TYPES

TALHA JAMIL

Page 1 of 1