Professional Documents
Culture Documents
Comparsion of Existing Sugar System Vs HP System
Comparsion of Existing Sugar System Vs HP System
Season Operation
High Pressure Cogeneration System
Boiler Outlet Steam Pressure (bar(a)) 22.00 66.00
Boiler Outlet Steam Temperature (Deg.C) 330.00 485.00
Boiler Feed Water inlet Temperature (Deg.C) 105 105.00
No. of Boilers 5 1
Total Boiler Steam Generation capacity 240 140.00
Actual HP Steam Generation in Seaosn (TPH) 200 140.00
Bagasse consumption (TPH) 95 63
Backpressure TG Capacity (MW) / Extraction cum condensing TG 13.00 26000
Number of Extraction Condensing TGs 0 1
Backpressure TG Capacity (MW) 5.0 NA
Number of Backpressure TGs 4 NA
Generation in Extraction Condensing TGs in Season NA 26350
Generation in Backpressure TG in Season (kW) 5000 NA
HP Cogen Auxiliary Power Consumption (kW) 2000
Electrical Power requirement of the sugar mill (kw) 7500
Net Export to Grid 16500
Off-Season Operation
Number of Boilers in Operation 1
Number of TGs in Operation 1
Total Steam generation (TPH) 105.00
Bagasse consumption (TPH) 43.00
No of days available for off season 111
Gross power generation (kW) 26000
Power consumption in sugar plant (kW) 400
Auxiliary power consumption (kW) 2000
Exportable Power in Off-season (kW) 23600.00
Annual Export
kwh (season) @ 95 % 48906000
kwh (off-season) @ 95% 59917235
Total Sale. (KWH) 108823235
Net Sale @ 11.42 Rs/Kwh 1242761346
one billion two hundred forty-two million seven hundred sixty-one thousand three hundred forty-six