We are pleased to submit herewith the quotation for work mentioned in details below for your kind
approval.
Quoted
Sl No Detailed Description Quantity Unit Rate (BDT) Amount (BDT)
1 Reception Area with Corridor
1.1 Custom Reception Table with drawer unit
3/4" veneer board, hardware, with matte 1 pcs 35,000 35,000
polish with Hidden light.
Drawer Unit (3/4" Melamine board, 2"' ply, 1 pcs 6,000 6,000
hardware and other accessories)
1.2 Wall Panel
1"x2" Gorjon Wood Frame, 1/2" particle board w 120 sf 200 24,000
1"x2" Gorjon Wood Frame, 3/4" Veneer board w 200 sf 250 50,000
Logo 1 Pcs 5,000 5,000
1.3 Wall Decoration
Photo Frame: 3/4" Veneer Board With Polish, 6 42 sf 350 14,700
Name Board: Polish and Replace 1 nos 2,500 2,500
Wall Hanging Spot 10 nos 700 7,000
Painitng 8 nos 6,000 48,000
1.4 Glass Door
10 mm imported tempered glass 1 Pcs 18,000 18,000
2 Library
2.1 Book Shelf
MS With Paint finish 530 sf 1,200 636,000
2.2 Reading Table
3' Dia glass top With MS Frame 2 nos 15,000 30,000
2.3 Study Table
3/4" melamine board, hardware with other acce 4 nos 12,000 48,000
2.4 Reaserch table
3/4" melamine board, hardware with other acce 1 nos 35,000 35,000
2.5 Librarian's Table
3/4" melamine board, hardware with other acce 1 nos 15,000 15,000
Drawer Unit (3/4" Melamine board, 2"' ply, 1 pcs 6,000 6,000
hardware and other accessories)
2.5 Haning Light
Custom Hanging Light 2 nos 1,500 3,000
3 Curtain Runner: 3/4 Particle Board with paint Fi 35 rf 250 8,750
4 Vertical Blinds: Imported 280 sf 90 25,200
6 Paint Work 2,000 sf 25 50,000
7 Electrical Works Lumpsum 25,000
Interior Material Cost 1,092,150
Design Charge 163,823
Total Price 1,255,973
Amount in words: BDT Twelve Lac Fifty Five Thousand Nine Hundred and Seventy Three Only.
Payment Mode:Payment shall only be made through pay order or crossed cheque in favor of Bion
2 Ltd. Payments are excluded Tax & VAT.
Project Delivery:
3 Project shall be delivered within 45 days of Project Kick Off however unavoidable circumstances
such as political unrest, unavailability of materials etc. shall not be accounted for this calculation
4 Validity of the Offer:This offer is valid for 4 weeks from the date of the submission of the offer
Subject: Financial Offer for Class Room Steel Structure and Interior Works.
Dear Sir,
We are pleased to submit herewith the quotation for work mentioned in details below for your kind
approval.
Quoted
Sl No Detailed Description Quantity Unit Rate (BDT) Amount (BDT)
1 Steel Structure
As per Design 1 nos 1,020,000 1,020,000
Civil Work
Dismentling & Rabish shifing works 300 sf 60 18,000
1.3 Ceiling
2'x2' metal ceiling 1,630 sf 150 244,500
1.4 Glass Door
2'-6" 10 mm imported tempered glass 2 Pcs 18,000 36,000
2 Service Area
2.1 Wash Room
Tiles Work with Other Fixtures 2 nos 75,000 150,000
7 Electrical Works 1,770 sf 100 177,000
Interior Material Cost 3,540,420
Design Charge 354,042
Total Price 3,894,462
Amount in words: BDT Thirty Eight Lac Ninety Four Thousand Four Hundred Sixty Two Only.
Payment Mode:Payment shall only be made through pay order or crossed cheque in favor of Bion
2 Ltd. Payments are excluded Tax & VAT.
Project Delivery:
3 Project shall be delivered within 3 month of Project Kick Off however unavoidable circumstances
such as political unrest, unavailability of materials etc. shall not be accounted for this calculation
4 Validity of the Offer:This offer is valid for 4 weeks from the date of the submission of the offer
Subject: Financial Offer for Wages of Civil, Dismentling & Color Works.
Dear Sir,
We are pleased to submit herewith the quotation for work mentioned in details below for your kind
approval.
Quoted
Sl No Detailed Description Quantity Unit Rate (BDT) Amount (BDT)
1 Civil Work (Internal Portion of building)
Plaster dismantling, New Plaster, Curing, Damp 19,350 sf 77 1,489,950
proof Color 3 coat, (Plastic PaintS)
Payment Mode:Payment shall only be made through pay order or crossed cheque in favor of Bion
2 Ltd. Payments are excluded Tax & VAT.
Project Delivery:
3 Project shall be delivered within 3 month of Project Kick Off however unavoidable circumstances
such as political unrest, unavailability of materials etc. shall not be accounted for this calculation
4 Validity of the Offer:This offer is valid for 4 weeks from the date of the submission of the offer
Md. Mustafijur Rahman
Head of Finance & Accounts
Bion Limited