Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KCA DEUTAG Drilling GmbH Qualittskontrolle

Deilmannstrae 1

Quality Control
Drilling GmbH 48455 Bad Bentheim

PROTOKOLL Nr. AUFTRAGS-Nr.


REPORT No. ORDER-No.

MASSKONTROLLE / MEASUREMENT CONTROL


___________________________________________________________________________________________
_

Kommission Kenn -No. Serial-No. Object Owner QC-Insp./Date

Object of Measurement Cameron Double Preventer ___ __/__ - ___.____ PSI , Type _____
P P 80 60-100 Preventer size Dimension P
A BC II I I II 7 1/16 all 40 mm
11 all 65 mm
13 5/8 all 80 mm
21 2000 150 mm
20 3000 150 mm
21 5000 100 mm
H 1 2 26 all 200 mm

IN FRONT:
Top flange
HYDRAULIC POR ____ - ________PSI flg/cl/stb
OPEN-SIDE
Side outlets
left right

3 4
Bottom flange
____ - ________PSI flg/cl/stb
Nominal Height: mm
Maximum Height: mm
D nom. id Nominal Width: mm
Maximum Width: mm
ITEM POINT OF NOMINAL ACTUAL POINT OF NOMINAL ACTUAL
MEASUREM. Max. MEASUREM. Max.
AI AI
A II A II
BI BI
1 B II 2 B II
CI CI
C II C II
D D
ITEM POINT OF NOMINAL ACTUAL POINT OF NOMINAL ACTUAL
MEASUREM. Max. MEASUREM. Max.
AI AI
A II A II
BI BI
3 B II 4 B II
CI CI
C II C II
D D
x = out of tolerances

Prfergebnis Ort und Datum:


Test result: Place and Date:
Prfer: Prfaufsicht:
Examiner: Surveillance:

You might also like