PHASE ONE
Labour 1,400
Transport 80
Total Cost GH5,829
By
Stephen Antwi
0264452805
ESTIMATE ON CABLES
PHASE TWO
Labour 3,000
Transport 100
Total GH11,647
By
Stephen Antwi
0264452805
5.5 2200
P.V.C conduit Pipes 400 pcs
33 Conduit Box
51 pcs 4.5 229.5
36 Conduit Box
43 pcs 6 258
70200 Junction Box
2 pcs 60 120
6 way Consumer Unit (Win Trip)
1 pc 1300 1300
Three Phase Shackles
1 pc 200 200
Circular Box
88 pcs 3.5 308
Bag of Cement
1 pc 28 28
Material cost
GH 4643.5
Labour
1,600
Transport
100
Total Cost
GH 6,344
By
Stephen Antwi
0264452805
ESTIMATE ON CABLES
PHASE TWO
Items Quantity Price GH Amount GH
1.5 mm Conduit Cable 19 Coils 96 1824
2.5mm Conduit Cable 15 Coils 150 2250
4mm Conduit Cable 6 Coils 235 1410
6mm Conduit Cable 1 Coil 395 395
10mm Conduit Cable 1 Coil 550 550
16mm Conduit Cable 2 Coils 870 1740
Cohezia T.V. cable 2 Coils 90 180
Earth Conductor 2 Coils 200 400
Change over 63Amp 1 Coil 440 440
Material Cost GH9,189
Labour 3,200
Transport 100
Total GH12,489
By
Stephen Antwi
0264452805