Inspection Checklist - Borepiling Work: YES NO Date NO. Items To Be Checked Acceptable Remarks
Inspection Checklist - Borepiling Work: YES NO Date NO. Items To Be Checked Acceptable Remarks
Inspection Checklist - Borepiling Work: YES NO Date NO. Items To Be Checked Acceptable Remarks
SUB-CONTRACTOR :
PILE NO.
CRITERIA / Acceptable
NO. ITEMS TO BE CHECKED REMARKS
CH'K METHOD YES NO DATE
1 Pre-Installation
a) Peg position Theodolite
b) Bore location 6m from new casted pile Record Sign : ( STS )
c) Collection pit Visual
d) Rebar cage Dwg
e) Concrete cover ; 75mm Measure Sign : ( KI )
2 Bore piling
a) Casing position Offset line Actual :
b) Kelly bar verticality Spirit Level
c) Toe Level ; RL -30m Measure Actual : Time :
d) Base cleaning min.30min after Record Time :
Cage 3 :
f) Tremie pipe
- Cleanliness Visual
- Top level Measure Actual :
- Tremie total length Record Actual :
- Toe depth max.200mm above toe Calculate Actual :
g) Bore hole water level
min. 2m above ground water level Measure Water level : 3m
Bore hole water level :
Sign : Sign :
3 Concreting G30N
a) Concrete Slump ; 18 + 2 Slump test Actual :
b) Time Time Start : Finish :
c) Top level ; min.1 x above cut off level Measure Actual :
d) Concrete Volume Record Dwg : Actual
Differences % :