Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

LAPORAN SEMESTER

PEMBIAYAAN & REALISASI PEMUATAN BUAH SAWIT

DEBET ( COST TONASE MUATAN BUAH SAWUT )

GRUTTY / KEBUN KPL- 1 RESAK LAIN-LAIN


PERIODE KREDIT ( Rp. )
SPBU Bungalon Babulu Babulu Bungalon Resak Bungalon Babulu ( Operasional dan

Kg Cost Kg Cost Kg Cost Kg Cost Kg Cost Kg Cost Kg Cost Kg Cost Entertain )

JANUARI 550,000,000 659,234 156,000,000 215,786 189,700,000 120,876 128,000,000 978,000 987,600,000 987,843 1,893,870,345 673,808 125,000,000 650,000 356,000,000 159,803 362,000,000 15,000,000

FEBRUARI 475,000,000 ;

MARET 400,000,000

APRIL 425,000,000

MEI 480,000,000

JUNI 650,000,000

Sub Total 2,980,000,000 659,234 156,000,000 215,786 189,700,000 120,876 128,000,000 978,000 987,600,000 987,843 1,893,870,345 673,808 125,000,000 650,000 356,000,000 159,803.00 362,000,000.00 15,000,000

Total Kredit Rp. `


Debet Rp. Diperiksa oleh, Kubar, 2016 Dilaporkan Olehl,
Operasional / Entertain Rp.
Total buan Sawit Termuat = Kg equiv. = Ton