Project Report Proposed By: R.B.Pethe & Co
Project Report Proposed By: R.B.Pethe & Co
PROPOSED BY
FOR
EQUIPMENT LOAN AND CC.
TOTAL COST OF EQUIPMENT-55.46 lakhs
TERM LOAN REQUIRED-37 lakhs
CC LIMIT OF RS 5 LAKHS
Project Prepared by
R.B.Pethe & Co.
Chartered Accountants
CONTENTS PAGE
NO.
Page 2 of 4
Project Report
Present Status:
Page 3 of 4
Existing Machine vs New
Existing New
1.Production 15 TPH 90TPH
2.Working Hours 10 10
3.Total Daily 150 Ton 900 Ton
Production
.
Term loan repayment
Repayment Period is considered over 7 years.
It can be observed that cash generations are adequate to make the
repayment of term loan on due dates.
Conclusion
Considering all facts and figures it appears that project is technically
feasible and economically and commercially viable.