Project: Vehicle (Car) Production

1. Proposal. 1 Week
2. Finalizing Design Features. 2 Weeks
3. Generating Design Sketches. 2 Weeks
4. Creating concept prototype. 2 Weeks
5. Modelling design in softwares. 2 Weeks
6. Reviewing the design- I 1 Week
7. Development & evaluation of Design improvements- I 3 Weeks
8. Component analysis. 4 Weeks
9. Creating production model. 3 Weeks
10. Developing a functional prototype. 2 Weeks
11. Testing and documenting the prototype. 2 Weeks
12. Reviewing the design- II 1 Week
13. Development & evaluation of Design improvements- II 2 Weeks
14. Design for manufacture and assembly. 3 Weeks
15. Failure models and effect analysis. 2 Weeks
16. Design analysis. 3 Weeks
17. Updating the component analysis. 1 Week
18. Creating final prototype. 2 Weeks
19. Testing of Prototype. 3 Weeks
20. Provisional Patent. 1 Week
21. Advertising and unveiling of the product. 3 Weeks
22. Final exposition. 2 Weeks