Line of Symmetry: Raft Top Reinforcement Layout Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LINE OF SYMMETRY

SC-2 SC-1

GRID

1 1

SC1 SECTION 1-1

SC2 SC1

REV. DATE DESCRIPTION BY CKD. APPR.


NO.

PAKISTAN CIVIL AVIATION AUTHORITY


ISLAMABAD INTERNATIONAL AIRPORT PROJECT (IIAP)
AIRPORT SECURITY FORCE (ASF) CAMP
NOTES.
SERGEANTS AND CORPORALS RESIDENCE (SC-1 & SC-2)
RAFT TOP REINFORCEMENT PLAN

NATIONAL ENGINEERING SERVICES


RAFT TOP REINFORCEMENT LAYOUT PLAN PAKISTAN (PRIVATE) LIMITED
DESN. NESPAK RECOMMENDED VER./CKD. APPROVED

DWN. MUNIR AHMAD


FILE 2927B/33T/C/SC1&2G02 MUHAMMAD AZEEM SALMAN SHAHID DR. MUHAMMAD RIZWAN

CKD. MUHAMMAD AZEEM DATE DRAWING NO. REV.

CONSTRUCTION DRAWING SUBM. SALMAN SHAHID 2927B/33T/C/SC1&2G03 0


OCT, 2016

You might also like