On 13th August, i was assigned at Environmental Impact Assessment (EIA) unit for a week. I
started my attachment at the unit by reporting at head of EIA unit, Madam Komalathevi. She briefly
explained to me about preliminary EIA, EIA report and post-EIA. During the first meeting, i was
given EIA writing guideline and Term of Reference (TOR) for dredging and reclaimation of land for
new jetty in Tanjung Langsat to study.
On second meeting with Madam Komala, she asked me to explain about what she had gave
me on previous meeting. Later on, she gave me full EIA report prepared by Kualiti Ceria Sdn Bhd on
the same project to study and prepare a summary regarding water quality, air quality, sedimentation
and waste management on that report as well as comparison between full EIA and TOR on that
project. I was given two days for preparation.
On last meeting with Madam Komala, i presented my summary on that EIA report as well as
suggestion whether the project can be approved by DOE and proceed or the otherwise.
Summary of Water Quality for EIA
Sumber Impak dan Aktiviti Kesan Alam Sekitar dan Cadangan Tebatan Impak Sampingan dan
Projek Kesan Sampingan Keperluan Pemantauan
-Sistem sanitasi dibina
ditapak di mana rawatan
-Penyelenggaraan tidak najis atau kumbahan
wajar terhadap berlaku di lokasi yang
kemudahan sanitasi sama menjana seperti
terutama pada pekerja dengan menggunakan
dan pejabat tapak boleh tangka septic
memberi kesan yang
berpotensi kerana -Pastikan untuk
bakteria pemindahan, membuat pembetungan Memerlukan pemantauan
Kemudahan sanitasi virus dan parasit yang mampan dengan yang ketat dan pengurusan
terdapat dalam najis mengambil kira oleh pengurus tapak atau
manusia keseluruhan dari pegawai tapak
pengalaman pengguna,
-Ia boleh mencemarkan najis dan pengumpulan
sumber air, tanah, dan sisa kaedah,
makanan dan memberi pengangkutan atau
kesan buruk terhadap pengangkut sisa,
kesihatan manusia rawatan dan
menggunakan semula
atau pelupusan
-Menyediakan dan
mewujudkan system loji
rawatan kumbahan
(STP) untuk merawat
kumbahan dan harus
mematuhi Standard A
berdasarkan Kualiti
Alam Sekeliling
Sembarangan lambakan (Kumbahan) Peraturan
Penghasilan sisa sisa kumbahan dan air 2009 Penyenggaraan system STP
kumbahan dan sullage basuhan akan adalah dengan kecekapan
menyebabkan -Penyelenggaraan STP dan pemprosesan yang
kemerosotan dan kesan yang betul perlu untuk tinggi
mungkin terhadap mengelakkan sebarang
kehidupan biologi kegagalan dan kesan
sampingan terhadap
alam sekitar
Anggaran penduduk
Terdapat 2 loji rawatan kumbahan (STP) telah dicadangkan untuk projek ini
STP dengan keluasan rizab sebanyak 5.25 ekar telah diperuntukkan untuk menampung
45000 PE manakala kawasan seluas 6.61 ekar untuk menampung 65000 PE
Reka bentuk STP perlu mendapatkan kelulusan daripada Indah Water Konsortium Sdn
Bhd (IWK) dan harus direka mengikut garis panduan Pihak Berkuasa Tempatan
Ini adalah untuk memastikan semua pelepasan kumbahan yang mengalir ke arah Loji
Rawatan Pembetungan mengikut prosedur Standard A
Air yang diperlukan untuk pembangunan disalurkan daripada air terawatt Syarikat Air Johor
Berhad (SAJ)
Ia adalah dasar SAJ untuk menyediakan bekalan air yang dirawat sepenuhnya yang
mencukupi kepada perkembangan-perkembangan dalam kawasan bekalannya
Air akan disalurkan daripada saluran paip retikulasi air SAJ yang sedia ada hendaklah
dipasang di kawasan rizab jalan daripada punca utama yang terdekat
Peringkat pembinaan
Langkah-langkah yang akan dilaksanakan di tapak projek mengurangkan kesan buruk dan kesan
hakisan dan pemendapan termasuk penggunaan:
Temperature, pH and Dissolved Oxygen (DO) were measured in situ by using DO meter while other
parameters were sent to accredited laboratory, Chemical Laboratory (Malaysia) Sdn Bhd, Skim
Akreditasi Makmal Malaysia (SAMM No.180) for analysis.