Handover Notes: Site / Place of Handover Department / Service From Date / Time To CC
Handover Notes: Site / Place of Handover Department / Service From Date / Time To CC
I. HSE Matters
Item. 12276C
Replace corroded FW line and 4 #150 gate valve at Train 1
Status:
Completed
Item. 12425/C
Removing 8 #600 blind flange and 8 #600 ball valve at API area
Status:
Completed
Item. 12340H
Assist CPA/INS for internal inspection and internal repair at V-46320, HR
cluster
Status:
Completed
IV. High Priority Job to be done in forthcoming days
Item. 12117/H
Re-installation of F-7700 at HV cluster
Item. 12298/H
Install scaffolding to assist PIM on 12 LP line HV to CPA
Item. 12308/H
Install scaffolding to assist PIM on 10 LP line HGA to CPA
Item. 11874/C
Repair 4 piping to T-5090, CERMAT #302502
V. Pending Job and to be solved
NIL