Vendor Document Review Sheet (DECAL) : J3 Program-Offsites & Utilities, Jamnagar, India Project Title
Vendor Document Review Sheet (DECAL) : J3 Program-Offsites & Utilities, Jamnagar, India Project Title
Vendor Document Review Sheet (DECAL) : J3 Program-Offsites & Utilities, Jamnagar, India Project Title
Permission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by Vendor,
and does NOT relieve Vendor from FULL compliance with Contractual Obligations
1 5
Revise & Resubmit.W ork may proceed,
F
Revise & Resubmit.W ork shall not Proceed
3
For Information Only
4
SANJAY DESAI / SHAILESH BAGADE 05.01.2015
By: Date:
Control Documents
Discipline:
Equipment No.
MS-UUZ761-001
4 Z 1 J U U - M S 0 0 0 0 1 - B E C - D - 0 0
MR Number
-
10015 4 Z 1 J U U - M S 0 0 0 0 1 - B E C - D 0 0 U U Z 7 6 1 - A 0 5 - 0 0 2 9 0 1
Page 1 of 1
Sr
Comments
Sellers Reply
No
2. Add Bearing Temperature Rise in the Characteristics of performance test Noted & Incorporated
4. Mechanical seal/Gland packing manufacture test certificate in 2.2 Noted & Incorporated
5.
including key as per RIL specification
Compliance certificate will be provided by
Page 1 of 2
6.
by TPIA
same.
As per Contract, vendor cannot source any material from China or Eastern
It is confirmed that no material is imported
7.
European countries.
from China or Eastern European countries.
3.1 MTC of all pressure retaining components like casing, impeller, shaft,
Page 2 of 2
MANUFACTURING DIVISION
PROJECT TTP PACKAGE SEZ
CONSULTANT
BECHTEL
PROJECT NO: 10P56
RIL PO NO: 1J/MX6/7488617-SEZ
Date
P Perform
V - MANUFACTURER/SUPPLIER
W Witness
B - VA TECH / APPOINTED TPIA
RW-Random Witness
IR Inspection Report
H-Hold Point
A - Approval
RT - Radiography Test
MANUFACTURING DIVISION
SEZ
Sl
Component
Characteristics Type of Check Extent
Reference
Acceptance
Format of
Inspection
Remarks
No
Operation/
of check
documents
norms
Record
Agency
Description
V B C
Datasheet/
Datasheet/
Volute Casing ,
Mech & Chem
COC
material TC's for fasteners will
Physical & Chem 1/batch
drg/Relevant
drg/Relevant
P. R R
1.1
Matls specs.
Matls specs.
Fastners
compliance Certificate will be
submitted.
MTC
UT For shaft DIA> Than 50
Shaft
P R R
1.2 mm
Surface Defects
RT Test
100%
ASTMA388
ANSIB 16.34
Datasheet/
Datasheet/
MTC
For CI , certificate for Mech
Matls specs.
Matls specs.
Datasheet/ drg,
2.1 @
P W W
Casing
whichever is higher for 30
minutes
Ensure
PMI will be offered only for
Datasheet/ drg,
2.2 @
P W W
Shaft
Composition
casing , impeller, back plate will
be non metallic.
MANUFACTURING DIVISION
SEZ
Sl
Component
Characteristics Type of Check Extent
Reference
Acceptance
Format of
Inspection
Remarks
No
Operation/
of check
documents
norms
Record
Agency
Description
V B C
Q VS H
Q VS EFF
Q VS POWER,
Approved
Performance Testing
Performance test
1/Lot/Ty
Approved
Noise & vibration shall be
Noise, Vibration,
Datasheet/ drg
IR P W W
3.1
with shop Motor
with shop Motor
pe
Datasheet/ drg
recorded for record.
Bearing
IS 5120
Temperature
Rise
Visual-Undue
IR
noticed during performance test
Breakage
be carried out
Painting on
Mfg std/ no
Preservation
Preservation
Dimension
Dimensions
Procedure
Procedure
Document
Approved
Approved
Material
INSPECTION
RELEASE NOTE
Scope of Supply
Purchase Order
Purchase Order
Order