‘Schedule No.: ar] | For Q.C. Office Use
Date of Issue: Scrutinized by :
Work Order No.
No. of OUS used + Sign.
No. of Log Slip enclosed | Date
No. of S.Tag/T.C. enclosed: “AMM JIC REV NO-09 Jan’17
Roam eee
No of call out complied:
No of additional sheet:
Aircraft VT-
Date :
‘24000 CY Repeat 12000Cy’
Check
ATR 42-320 AIRCRAFT FITTED WITH PWC 121 ENGINE & HS 14SF5
PROPELLER
MPD Ref: Rev 30 dated Oct’15
Approved by Dy-Continuing Airworthiness Manager, AASL, ATR vide letter no AASL /ATR /Dy-
CAM- /BMM-KOL /131/16 dated 27/10/16.
Aircraft Hours Since New :
Aircraft Landings Since New
Arrived From: ees ALS eves RIS. On: (dt)... Fit. No
Inspection commenced at: eat Completed at:
STD: eer
Departed To : Coeteahtny ADDS he On : (dt.) Fit. No,
Delay (if any) eehie)
Reason of Delay. Vee avasseneah
INSTRUCTIONS
All AMEs signing this schedule must mention their Licence / Approval No. at least once on
each page signed by them. If more than one AMEs are signing different items of
inspections on the same page then they are required to mention their Licence / Approval
No. against each of such signatures.
2. All signatures and Licence / Approval Nos. must be legible.
1
This schedule contains 03 pages.
REV-9, Aug’ 17 Page 1VT.
ALLIANCE AIR
‘24000 CY Repeat 12000Cy’ Check
All Engineers/Approved Persons signing this schedule should furnish following
details:
=
9°
NAME
Lic/App.
CaTeGorY Gi
SIGNATURE
INITIALS
2} o) a] a} ol nl
+ Equipment and Tools:
(1) Electrical Ground Power Unit.
(2) Access Plat Forms
(3) Elotest B2-SD/Equivalent
(4) Mini Rotary probe MI
IRS 35/50 frequency range 50KHZ-2MHZ
(5) Standard Block (AL)-P/N98S51605001-218.
(6) Calibration Standard P/N-98851605001-200
(7) Portable Light and mirror
(8) Pencil Probe KAS70-4 frequency range SOKHZ-3MHZ
Bulk Materials: -
Lint Free cloth,
Cleaning Agent (11-002)
MEK(11-003)
Sealant (09-019C)
BONS
REY-00, October? 12
?) -PD6BO (white spirit)
Page 2Amga eae
ALLIANCE AIR
ATR 42-320 AIRCRAFT FITTED. WITH PW 121 VT ALLIANCE AIR
ENGINES & HS 14SF-5 PROPELLER
24000 CY
REPEAT 12000CY
CHECK
Deseapion TaskReruewo | TECH [AME
RODE ASCE TABOO
SPECIAL DETALED INSPECTION FORCRACK aR or
lbetecnion on nove s extenal cumtace
1 INCLUDING ZONE 212-
Re CeNTRAL RETANER REMOVAL
ics tavu aia 2B, StooNr av
SPECIAL DETALED INSPECTION FOR CARCK RS STE SOTROOT
2. Joerecrion ow nope eno Franc Avo spuce| eae
furitrNey
FUSELAGE CENTER SECTION DETALED VSUAL TS SSSTSOOVIOGIOT
INSPECTION FOR crack DeTEGTONOFrioeR [iene arm
BEAN ATIR-26: AROUNS GUT SUIS ron
3 JELECTRICAL/ ELECTRONICS COOLING DUCTS AND
SYORAULIG PIPES NTA RNIoN
Jace ata prior Sexor aezcn
24000CY REPEAT 12000CY CHECK COMPLETED AT
Time Time
Signature Signature
Date. Date.
AMEIAPP.No, AME/APP No,
Category. Category,
Time Time
Signature Signature
Date Date
AMEVAPP No, AMEVAPP.No,
Category. Category.
Rev-01, May'13 page-3