Bunker Calculation - R0

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

18/06/2009 0 Submitted for approval Parikshit P.K.Das G.S.

Mahal
Mukherjee
Date Rev Description of ALT CHD APPD
Revision

O. P. JINDAL SUPER THERMAL POWER PROJECT


4 X 600 MW, UNIT NO. 1, 2, 3 & 4

BHARAT HEAVY ELECTRICALS LTD


POWER SECTOR PROJECT ENGINEERIING
MANAGEMENT
NEW DELHI

JOB No. 329


BHEL Doc. No: PE-DC-329-161-A001 Rev: 00
STATUS CONTRACT
PACKAGE BUNKER
TITLE CAPACITY CALCULATION OF BUNKER
PREPARED BY P. MUKHERJEE SD /- 18.06.2009
CHECKED BY P. K. DAS SD /- 18.06.2009
APPROVED BY G. S. MAHAL SD /- 18.06.2009
Calculation for circular bunker with 2 slots

Project / Proposal : 4 x 600 MW O. P. Jindal TPS Revision number : 00


Unit number : 1, 2, 3 & 4 Prepared by : P. Mukherjee
Date : 18 - 06 - 2009 Ref. drg no : CB - 2S.dwg
Input

Basis of calulation at BMCR

Bulk density of coal considered in 0.8 O 12500.00


T/M3, BDY
Performance coal consumption / unit 455 PH 12.00
in T.P.H at BMCR ( by boiler
manufacturer / proposal ), CCD
Worst coal consumption / unit in 0 PV 12.00
T.P.H at BMCR ( by boiler
manufacturer / proposal ), CCW
Clear space / walkway required for 0.8 Number of active bunkers / unit for 6.00
performance coal, QABD ( by mill
maintenance in metres, CS manufacturer / proposal)
F 914 Number of active bunkers / unit for worst 0.00
coal, QABW ( by mill manufacturer /
proposal)
G 9700 Capacity provided in terms of hours for 12.00

bunkers / unit for performance coal, SCD


H1 200 Capacity provided in terms of hours for 0.00
bunkers / unit for worst coal, SCW
H6 500 Margin considered in minutes for outflow, 10.00
TM
H7 20
L1 1384
L2 0
LH 3.15 Number of conveyor streams considered 2.00
above tripper floor, XN
Elevation of bunker outlet flange in 29 Angle of repose in degrees, Y1 37.00
metres as indicated by Trichy /
Proposal Group, LOF
LV 0 Final wall angle considered for bunker in 70.00
degrees, Y2
M1 600 Type of mill considered (tube / bowl) XRP - 1103
M2 600 Total number of bunkers / unit as 8.00
indicated by Trichy

Output

A 1640.0 H5 10379.56
B4 8476.0 HBO in metres 30.5
D 3418.0
D5 8469.7 Elevation of bunker / tripper floor in 59.5
metres , LTF
H2 1540.0 Amount of coal / bunker in tonnes 910.00
H3 2575.6 M3 3.384
H4 in metres 15.2 M4 0.616

Note : All dimensions are in mm unless otherwise stated.

1 of 1 CB-2S - R00.xls

You might also like