Flow Chart For Sewer Pipe

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Sewer Pipe only

??

Sewer Pipe Dia > 1m Yes Excavation Depth > 6m No Design Considered as
ERSS - (non-UBW)

Yes
No
Appointment Reqd
Design Considered as a) Qualify person
No Submission ERSS - UBW - PE (Any)
required b) Accredited Checker
- AC (Struct)
Appointment Reqd
a) Qualify person
ST application required - PE (Design)
- PE (Geo) ST application required
Submission of UBW Plans b) Accredited Checker
Endorsed by- - AC (Struct) Submission of non-UBW Plans
- QP(D) - AC - AC (Geo) Endorsed by-
- QP(Geo) (D) - AC(Geo) - QP(D) * - AC
Submit Ex_UBW_Annex A *(Endorse not reqd by AC for Depth 4m)
Design consideration for TERS Submit Ex_Annex A
(submit during ST application) Design consideration for TERS
Signed by- (Submit during ST application)
Section-I - QP (D) Signed by-
- QP (Geo) (D) Section-I - QP (D)
Section-II - AC (Struct) ** Section-II - AC (Struct)
- AC (Geo) **(Section-II not reqd by AC for Depth 4m)

Permit Application Permit Application


Signed by- Signed by-
- Developer - Builder - Developer - Builder
- QP(S) - QP(Geo) (S) - QP(S)
- QP(A) - QP(A)
Submit Ex_UBW_Annex B Submit Ex_Annex B
(Submit during Permit application) (Submit during Permit application)
Signed by- Signed by-
Section-I - QP (S) Section-I - QP (S)
- QP (Geo) (S) Section-II - Builder
Section-II - Builder
Section-III - QP (S) Ex_Annex C (Keep at Site)
- QP (Geo) (S) Site Inspection and Approval Record
Signed by-
- QP (S)
Ex_UBW_Annex C (Keep at Site) - Builder
Site Inspection and Approval Record *** Review by-
Signed by- - AC
- QP (S) ***(Review not reqd by AC for Depth 4m)
- QP (Geo) (S)
- Builder Ex_Annex D (Keep at Site)
Review by- Ground movement Assessment record
- AC (Struct) Signed by-
- AC (Geo) - QP (S)
- QSS
Ex_UBW_Annex D (Keep at Site)
Ground movement Assessment record
Signed by- Submit Ex_Annex E
- QP (S) (submit before 7th day of the following month)
- QP (Geo) (S) Monthly Instrumentation and monitoring record
- QSS Signed by-
- QP (S)
Submit Ex_UBW_Annex E
(submit before 7th day of the following month)
Monthly Instrumentation and monitoring record
Signed by-
- QP (S)
- QP (Geo) (S)