Annexure - 1 Key Plan: Bhakti Nagar Bus Stop Bridge
Annexure - 1 Key Plan: Bhakti Nagar Bus Stop Bridge
KEY PLAN
BRIDGE
BHAKTI NAGAR
BUS STOP
MORBI MALIYA
IOC
FACTORY
Petrol
Pump 0.9 km
HARIPAR
KERALA
ROAD
N
ANNEXURE 2 PLANT LAY-OUT
ANNEXURE 3
MANUFACTURING PROCESS
Phenol Formaldehyde Resin:
Manufacturing Process
First all raw materials like phenol, formaldehyde & caustic will be added into closed
vessel.
Stirring & heating will be done upto 60 C. After 60C stop heating.
Reflux is done for 30 minutes upto 98 C.
Vacuum distillation will be started.
Water will be removed from the vessel as per the batch size.
Cooling down to 40 C.
Methanol will be added for dilution purpose.
Phenol Formaldehyde Resin will be ready for use in Laminate sheets as well as sell
purpose.
Reaction Chemistry
Process Flow Diagram
Phenol
Limped Reaction Vessel
Formaldehyde
Caustic Flakes
Stirring and heating up
to 60 C
Cooling
Methanol Dilution
Product:
Phenol Formaldehyde
Resin
Melamine Formaldehyde Resin:
Manufacturing Process
First all the raw materials melamine, formaldehyde & caustic will be added in
Limped reaction vessel.
PH will be adjusted by adding Caustic.
Stirring & heating will be done upto 90 C for 1 Hr.
Cooling down to 40 C.
Add required quantity of Methanol
Melamine Formaldehyde Resin will be ready for use and for sell purpose.
Reaction Chemistry
N N
H2N NH2 fast
N N
+ H2C O
N N
NH2 H2C N CH2
melamine formaldehyde OH HO
melamine formaldehyde resin
Process Flow Diagram
Melamine
Limped Reaction Vessel
Formaldehyde
Caustic
Stirring and Heating up
to 95C for 1 hr
Cooling at 40C
Product:
Melamine Formaldehyde
Resin
Urea Formaldehyde Resin:
Manufacturing Process
First all the raw materials Urea & Formaldehyde will be added in Limped reaction
vessel.
pH will be adjusted to pH 9.0 by adding acetic acid.
Stirring & heating will be done upto 95 C for 50 Minutes.
Heating will be continued until tolerance (10:40) is achieved.
pH adjusted to 9
Acetic Acid
Caustic pH adjusted to 9
Cooling
Product: Urea
Formaldehyde Resin
ANNEXURE 4
ETP PROCESS :
Industrial wastewater generated due to boiler blow down, cooling blow
down and resin manufacturing process and washing process will be
collected in Primary Collection tank and neutralized the effluent to make
homogeneous mixture.
Subsequently effluent from Primary Collection tank will be collected in
holding tank, where Photo Fenton Reagent (H2O2, FeSO4) will be added
and proper mixed with stirrer to destroy the Phenolic compounds.
Treated effluent from holding tank will be sent to primary settling tank to
remove the solid particle from the effluent.
Supernatant from Primary settling tank will be taken in to evaporation
system to evaporate the effluent.
Sludge will be collected in HDPE bags and sent to register TSDF site.
Thus the industry will achieve Zero discharge.
FeSO4.
H2O2
7H2O
Sun rays sun
H2O
Collection Tank
EFFLUEN (2 X 2500 L)
T FROM Water Inlet
THE
PLANT
SETTLING
TANK 20000 L
1 2 3 4
1.5 x 1.5 (3.375 M3 each)
ANNEXURE 6
Total: 26,424
Liter/ Day
Recycle
7800 L/D
Drinking use 5650 Lit/day Washing Process
R. O.
250 Lit/Day goes to soak 200 L/D
48000 L/D Scrubbing &
pit through Nil
Cooling Dilution
septic tank 200 L/D Process
7800 4000 L/D
13860
Lit/day R.O. Reject Steam Boiler L/D
36000 L/D
12000 Scrubbed
Blow
methanol
Down
L/D sold to
400 L/D Expedio De- Authorized
scalar Condensate Boiler Blow-
recycler
down 3600
12000 L/D 25,200 L/D L/D
Sludge 40
Kg/day
Note: * It may be noted that some raw materials are containing water which will be removed from the
process.
ANNEXURE 7
DETAILS OF FLUE GAS STACK
In meter
1 Steam
Boiler
4 MT
30 Bag Filter PM As per
2 Thermic GPCB
(Common Coal SO2
Fluid Norms
Stack)
Heater 7.97 MT/Day NOx
(15,00,000
Kcal/Hr)
Note: Resin is use for manufacturing of Laminated Sheets (2, 00,000 no. /Month). Resin is
used for captive consumption as well as sells purpose.
Caustic 6.05
Methanol 100
Melamine 200
Caustic 6
Acetic Acid 6
ANNEXURE 9