Professional Documents
Culture Documents
Kap4 DWG 119 MBXX Me 0165
Kap4 DWG 119 MBXX Me 0165
Kap4 DWG 119 MBXX Me 0165
Ministry of Interior PROGER Engineering & Management Al Arrab Contracting Co. Ltd.
Discipline
Project Name: General Directorate for Building Security
Building
Number
Code ID
Project
Count
Type
Site
Project No. 119
To: Project Director - Proger Head Office
1-Mar-16 Transmittal No. KAP4 - DWG - 119 - MBXX - ME - 0165
For transmittal type above use one of the following: DWG-Drawings; SCH-Schedule; OTH-Other;
Action
Serial
DWG. / Schedule Ref. Number Rev. Description
#
Copy to:
M.A.Qayyum (MAQ)
Corrections or comments made relative to submittals during this review do not relieve the contractor from full compliance with the requirements of the contract's documents, dimensions selecting fabrication processes and techniques of construction; coordinating his
work with that of other trades, and performing his work in a safe and satisfactory manner and correlating all quantities and conformance with the design concept of the project and general compliance with the information given in the contract documents. The
contractor is responsible for the provided specifications. This check is only for general review
E FOR INFORMATION ONLY F RECEIVED, NO ACTION TAKEN I Item listed but not Received
II ITEM RECEIVED AS HARD COPY WITH NO SOFT COPY III ITEM RECEIVED AS SOFT COPY WITH NO HARD COPY
K4_Com_Transmittal_009 V2