PERIPHERAL BEAM
DEFLECTION CALCULATION
361 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 30/01/09
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Vertical Deflection Calculation
RR JSB/MDS
Vertical deflection of edge beam is calculated for the most unfavourable serviceability load
case. Edge Beams in five faces of clinic building is checked for deflection. i.e. north face,
east face,south face, west face curved portion and west face as shown previously.
The following pages shows the vertical deflection calculation of edge beams
in second mezzanine floor level ( since the loading is more in this floor due to presence of
mechanical rooms).Vertical deflection calculation for the beam which has maximum
362 of 392
3.1. NORTH FACE
363 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
2
Elasticmodulusforreinforcement Es = 200000 N/mm
Ec28 37000
Long term elastic modulus Eeff = ------------------- = ------------------------- = 24666.67 N/mm2
[ 1 + (,to) 1+ 0.5
Es 200000
Effective modular ratio e = --------------- = ------------------------- = 8.11
Eeff 24666.67
Clear cover = 40 mm
b.h2
------ + ( e - 1) (As. d + As2. d2)
2
Xu = -------------------------------------------------
b.h + ( e - 1) (As + As2)
364 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
= 307.15 mm
b . h3 h 2
2 2
Iu = ------- + b. h { --- - Xu } + ( e - 1) (As.( d - Xu) + As2.(Xu- d2) )
12 2
4
= 1.2E+10 mm
Cracking moment
= 1 - 0.5 (Mcr/MQP)
2
= 1 - 0.5 x ( 128.19 / 295.00 )
= 0.906
2 0.5
{ [ ( As. e+As2.(e1) +2b(As.d.e+As2.d2(e1))] (As.e+As2.(e1))}
Xc = --------------------------------------------------------------------------------------------------------------------
b
2
{ 2130 x 8.11 + 521 x ( 8.11 - 1)
0.5
+ 2 x 600 x ( 2130 x 540 x 8.11 + 521 x 50 x ( 8.11 - 1 )) }
600
365 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
0.5
= ( 4.399E+08 + 1.14E+10 ) - 2.10E+04
------------------------------------------------------------------------------
600
Xc = 146.50 mm
b . Xc3
2 2
Ic = ------- + ( e .As.( d - Xc) +( e-1)As2.(d2-Xc) )
3
3
600 x 146.5
2
= -------------------------- + 8.11 x 2130 x ( 540 - 146.5 ) + ( 8.11 - 1) x
3
2
521 x ( 50 - 146.50 )
4
= 3.3E+09 mm
Flexural curvature
1 MQP MQP
------ = ----------------- + ( 1 - ) ------------
rn Eeff x Ic Eeff x Iu
2.95E+08 3E+08
= 0.906 x -------------------------------------- + ( 1- 0.906 ) x -----------------------------------------
24666.67 x 3.3E+09 24666.67 x 1.2E+10
= 3.2E-06 + 9.5E-08
1
---- = 3.3E-06
rn
Total strinkage strain
cd = 449
366 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
cs = cd + ca
= 449 + 75
= 5.24E-04
1 Su Sc
------ = cs.e. ----- + ( 1 - ) cs.e. ------
rcs Iu Ic
3
= 3.6E+05 mm
3
= 7.9E+05 mm
1 3.62E+05
------ = 0.91 x 5.2E-04 x 8.11 x ------------------ + ( 1- 0.91 ) x 5.24E-04 x
rcs 1.19E+10
7.88E+05
x 8.11 x -------------------
3.34E+09
1
------ = 2.12E-07
rcs
1 1 1
------ = ------ + ----- = 3.34E-06 + 2.12E-07 = 3.55E-06
rt,QP rn rcs
Total deflection
1
2
QP = K. L . -------------------
rt,QP
K = 0.104 x ( 1 - (
/10))
367 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
Edge Beam :-
Bending moment
MA + MB 397.000 + 472.000
= --------------- = ---------------------------- = 2.95
Mc 295.000
2.95
K = 0.104 x ( 1- --------- )
10
K = 0.0734
368 of 392
3.2. EAST FACE
369 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
2
Elasticmodulusforreinforcement Es = 200000 N/mm
Ec28 37000
Long term elastic modulus Eeff = ------------------- = ------------------------- = 24666.67 N/mm2
[ 1 + (,to) 1+ 0.5
Es 200000
Effective modular ratio e = --------------- = ------------------------- = 8.11
Eeff 24666.67
Clear cover = 40 mm
b.h2
------ + ( e - 1) (As. d + As2. d2)
2
Xu = -------------------------------------------------
b.h + ( e - 1) (As + As2)
370 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
= 308.87 mm
b . h3 h 2
2 2
Iu = ------- + b. h { --- - Xu } + ( e - 1) (As.( d - Xu) + As2.(Xu- d2) )
12 2
2 2
( 8.11 - 1 ) x { 2500 x ( 540 - 308.87 ) + 521 ( 308.87 - 62.5 ) }
4
= 1.2E+10 mm
Cracking moment
= 1 - 0.5 (Mcr/MQP)
2
= 1 - 0.5 x ( 130.24 / 342.00 )
= 0.927
2 0.5
{ [ ( As. e+As2.(e1) +2b(As.d.e+As2.d2(e1))] (As.e+As2.(e1))}
Xc = --------------------------------------------------------------------------------------------------------------------
b
2
{ 2500 x 8.11 + 521 x ( 8.11 - 1)
0.5
+ 2 x 600 x ( 2500 x 540 x 8.11 + 521 x 62.5 x ( 8.11 - 1 )) }
600
371 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
0.5
= ( 5.747E+08 + 1.34E+10 ) - 2.40E+04
------------------------------------------------------------------------------
600
Xc = 157.16 mm
b . Xc3
2 2
Ic = ------- + ( e .As.( d - Xc) +( e-1)As2.(d2-Xc) )
3
3
600 x 157.2
2
= -------------------------- + 8.11 x 2500 x ( 540 - 157.2 ) + ( 8.11 - 1) x
3
2
521 x ( 62.5 - 157.16 )
4
= 3.8E+09 mm
Flexural curvature
1 MQP MQP
------ = ----------------- + ( 1 - ) ------------
rn Eeff x Ic Eeff x Iu
3.42E+08 3.4E+08
= 0.927 x -------------------------------------- + ( 1- 0.927 ) x -----------------------------------------
24666.67 x 3.8E+09 24666.67 x 1.2E+10
= 3.4E-06 + 8.4E-08
1
---- = 3.5E-06
rn
Total strinkage strain
cd = 449
372 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
cs = cd + ca
= 449 + 75
= 5.24E-04
1 Su Sc
------ = cs.e. ----- + ( 1 - ) cs.e. ------
rcs Iu Ic
3
= 4.5E+05 mm
3
= 9.1E+05 mm
1 4.49E+05
------ = 0.93 x 5.2E-04 x 8.11 x ----------------- + ( 1- 0.93 ) x 5.24E-04 x
rcs 1.20E+10
9.08E+05
x 8.11 x -------------------
3.78E+09
1
------ = 2.21E-07
rcs
1 1 1
------ = ------ + ----- = 3.49E-06 + 2.21E-07 = 3.71E-06
rt,QP rn rcs
Total deflection
1
2
QP = K. L . -------------------
rt,QP
K = 0.104 x ( 1 - (
/10))
373 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
Edge Beam :-
Bending moment
MA + MB 480.000 + 542.000
= --------------- = ---------------------------- = 2.99
Mc 342.000
2.99
K = 0.104 x ( 1- --------- )
10
K = 0.0729
374 of 392
3.3. SOUTH FACE
375 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
2
Elasticmodulusforreinforcement Es = 200000 N/mm
Ec28 37000
Long term elastic modulus Eeff = ------------------- = ------------------------- = 24666.67 N/mm2
[ 1 + (,to) 1+ 0.5
Es 200000
Effective modular ratio e = --------------- = ------------------------- = 8.11
Eeff 24666.67
Clear cover = 40 mm
b.h2
------ + ( e - 1) (As. d + As2. d2)
2
Xu = -------------------------------------------------
b.h + ( e - 1) (As + As2)
376 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
= 302.23 mm
b . h3 h 2
2 2
Iu = ------- + b. h { --- - Xu } + ( e - 1) (As.( d - Xu) + As2.(Xu- d2) )
12 2
2 2
( 8.11 - 1 ) x { 1000 x ( 540 - 302.23 ) + 521 ( 302.23 - 62.5 ) }
4
= 1.1E+10 mm
Cracking moment
= 1 - 0.5 (Mcr/MQP)
2
= 1 - 0.5 x ( 121.12 / 112.00 )
= 0.415
2 0.5
{ [ ( As. e+As2.(e1) +2b(As.d.e+As2.d2(e1))] (As.e+As2.(e1))}
Xc = --------------------------------------------------------------------------------------------------------------------
b
2
{ 1000 x 8.11 + 521 x ( 8.11 - 1)
0.5
+ 2 x 600 x ( 1000 x 540 x 8.11 + 521 x 62.5 x ( 8.11 - 1 )) }
600
377 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
0.5
= ( 1.395E+08 + 5.53E+09 ) - 1.18E+04
------------------------------------------------------------------------------
600
Xc = 105.83 mm
b . Xc3
2 2
Ic = ------- + ( e .As.( d - Xc) +( e-1)As2.(d2-Xc) )
3
3
600 x 105.8
2
= -------------------------- + 8.11 x 1000 x ( 540 - 105.8 ) + ( 8.11 - 1) x
3
2
521 x ( 62.5 - 105.83 )
4
= 1.8E+09 mm
Flexural curvature
1 MQP MQP
------ = ----------------- + ( 1 - ) ------------
rn Eeff x Ic Eeff x Iu
1.12E+08 1.1E+08
= 0.415 x -------------------------------------- + ( 1- 0.415 ) x -----------------------------------------
24666.67 x 1.8E+09 24666.67 x 1.1E+10
= 1.1E-06 + 2.3E-07
1
---- = 1.3E-06
rn
Total strinkage strain
cd = 449
378 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
cs = cd + ca
= 449 + 75
= 5.24E-04
1 Su Sc
------ = cs.e. ----- + ( 1 - ) cs.e. ------
rcs Iu Ic
3
= 1.1E+05 mm
3
= 4.1E+05 mm
1 1.13E+05
------ = 0.42 x 5.2E-04 x 8.11 x ----------------- + ( 1- 0.42 ) x 5.24E-04 x
rcs 1.14E+10
4.12E+05
x 8.11 x -------------------
1.77E+09
1
------ = 5.94E-07
rcs
1 1 1
------ = ------ + ----- = 1.30E-06 + 5.94E-07 = 1.89E-06
rt,QP rn rcs
Total deflection
1
2
QP = K. L . -------------------
rt,QP
K = 0.104 x ( 1 - (
/10))
379 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
Edge Beam :-
Bending moment
MA + MB 10.000 + 305.000
= --------------- = ---------------------------- = 2.81
Mc 112.000
2.81
K = 0.104 x ( 1- --------- )
10
K = 0.0748
380 of 392
3.4. WEST FACE CURVED
PORTION
381 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
2
Elasticmodulusforreinforcement Es = 200000 N/mm
Ec28 37000
Long term elastic modulus Eeff = ------------------- = ------------------------- = 24666.67 N/mm2
[ 1 + (,to) 1+ 0.5
Es 200000
Effective modular ratio e = --------------- = ------------------------- = 8.11
Eeff 24666.67
Clear cover = 40 mm
b.h2
------ + ( e - 1) (As. d + As2. d2)
2
Xu = -------------------------------------------------
b.h + ( e - 1) (As + As2)
382 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
= 317.18 mm
b . h3 h 2
2 2
Iu = ------- + b. h { --- - Xu } + ( e - 1) (As.( d - Xu) + As2.(Xu- d2) )
12 2
2 2
( 8.11 - 1 ) x { 4500 x ( 540 - 317.18 ) + 521 ( 317.18 - 62.5 ) }
4
= 1.3E+10 mm
Cracking moment
= 1 - 0.5 (Mcr/MQP)
2
= 1 - 0.5 x ( 142.24 / 478.00 )
= 0.956
2 0.5
{ [ ( As. e+As2.(e1) +2b(As.d.e+As2.d2(e1))] (As.e+As2.(e1))}
Xc = --------------------------------------------------------------------------------------------------------------------
b
2
{ 4500 x 8.11 + 521 x ( 8.11 - 1)
0.5
+ 2 x 600 x ( 4500 x 540 x 8.11 + 521 x 62.5 x ( 8.11 - 1 )) }
600
383 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
0.5
= ( 1.615E+09 + 2.39E+10 ) - 4.02E+04
------------------------------------------------------------------------------
600
Xc = 199.35 mm
b . Xc3
2 2
Ic = ------- + ( e .As.( d - Xc) +( e-1)As2.(d2-Xc) )
3
3
600 x 199.4
2
= -------------------------- + 8.11 x 4500 x ( 540 - 199.4 ) + ( 8.11 - 1) x
3
2
521 x ( 62.5 - 199.35 )
4
= 5.9E+09 mm
Flexural curvature
1 MQP MQP
------ = ----------------- + ( 1 - ) ------------
rn Eeff x Ic Eeff x Iu
4.78E+08 4.8E+08
= 0.956 x -------------------------------------- + ( 1- 0.956 ) x -----------------------------------------
24666.67 x 5.9E+09 24666.67 x 1.3E+10
= 3.1E-06 + 6.7E-08
1
---- = 3.2E-06
rn
Total strinkage strain
cd = 449
384 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
cs = cd + ca
= 449 + 75
= 5.24E-04
1 Su Sc
------ = cs.e. ----- + ( 1 - ) cs.e. ------
rcs Iu Ic
3
= 8.7E+05 mm
3
= 1.5E+06 mm
1 8.70E+05
------ = 0.96 x 5.2E-04 x 8.11 x ----------------- + ( 1- 0.96 ) x 5.24E-04 x
rcs 1.27E+10
1.46E+06
x 8.11 x -------------------
5.89E+09
1
------ = 3.24E-07
rcs
1 1 1
------ = ------ + ----- = 3.21E-06 + 3.24E-07 = 3.54E-06
rt,QP rn rcs
Total deflection
1
2
QP = K. L . -------------------
rt,QP
K = 0.104 x ( 1 - (
/10))
385 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
Edge Beam :-
Bending moment
MA + MB 850.000 + 326.000
= --------------- = ---------------------------- = 2.46
Mc 478.000
2.46
K = 0.104 x ( 1- --------- )
10
K = 0.0784
386 of 392
3.5. WEST FACE
387 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
2
Elasticmodulusforreinforcement Es = 200000 N/mm
Ec28 37000
Long term elastic modulus Eeff = ------------------- = ------------------------- = 24666.67 N/mm2
[ 1 + (,to) 1+ 0.5
Es 200000
Effective modular ratio e = --------------- = ------------------------- = 8.11
Eeff 24666.67
Clear cover = 40 mm
b.h2
------ + ( e - 1) (As. d + As2. d2)
2
Xu = -------------------------------------------------
b.h + ( e - 1) (As + As2)
388 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
= 308.01 mm
b . h3 h 2
2 2
Iu = ------- + b. h { --- - Xu } + ( e - 1) (As.( d - Xu) + As2.(Xu- d2) )
12 2
2 2
( 8.11 - 1 ) x { 2300 x ( 540 - 308.01 ) + 521 ( 308.01 - 62.5 ) }
4
= 1.2E+10 mm
Cracking moment
= 1 - 0.5 (Mcr/MQP)
2
= 1 - 0.5 x ( 129.03 / 315.00 )
= 0.916
2 0.5
{ [ ( As. e+As2.(e1) +2b(As.d.e+As2.d2(e1))] (As.e+As2.(e1))}
Xc = --------------------------------------------------------------------------------------------------------------------
b
2
{ 2300 x 8.11 + 521 x ( 8.11 - 1)
0.5
+ 2 x 600 x ( 2300 x 540 x 8.11 + 521 x 62.5 x ( 8.11 - 1 )) }
600
389 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
0.5
= ( 4.996E+08 + 1.24E+10 ) - 2.24E+04
------------------------------------------------------------------------------
600
Xc = 151.76 mm
b . Xc3
2 2
Ic = ------- + ( e .As.( d - Xc) +( e-1)As2.(d2-Xc) )
3
3
600 x 151.8
2
= -------------------------- + 8.11 x 2300 x ( 540 - 151.8 ) + ( 8.11 - 1) x
3
2
521 x ( 62.5 - 151.76 )
4
= 3.5E+09 mm
Flexural curvature
1 MQP MQP
------ = ----------------- + ( 1 - ) ------------
rn Eeff x Ic Eeff x Iu
3.15E+08 3.2E+08
= 0.916 x -------------------------------------- + ( 1- 0.916 ) x -----------------------------------------
24666.67 x 3.5E+09 24666.67 x 1.2E+10
= 3.3E-06 + 9.0E-08
1
---- = 3.4E-06
rn
Total strinkage strain
cd = 449
390 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
cs = cd + ca
= 449 + 75
= 5.24E-04
1 Su Sc
------ = cs.e. ----- + ( 1 - ) cs.e. ------
rcs Iu Ic
3
= 4.1E+05 mm
3
= 8.5E+05 mm
1 4.06E+05
------ = 0.92 x 5.2E-04 x 8.11 x ----------------- + ( 1- 0.92 ) x 5.24E-04 x
rcs 1.19E+10
8.46E+05
x 8.11 x -------------------
3.54E+09
1
------ = 2.17E-07
rcs
1 1 1
------ = ------ + ----- = 3.40E-06 + 2.17E-07 = 3.61E-06
rt,QP rn rcs
Total deflection
1
2
QP = K. L . -------------------
rt,QP
K = 0.104 x ( 1 - (
/10))
391 of 392
LARSEN & TOUBRO LIMITED
ECC Division - GES
DOCUMENT NO DATE
PROJECT: SIDRA MEDICAL & RESEARCH CENTER, DOHA
1861B-CS-05-002-03 1/30/2009
DESIGNED CHECKED SHEET
TITLE: Clinic Building - Deflection Calculation
RR JSB/MDS
Edge Beam :-
Bending moment
MA + MB 422.000 + 530.000
= --------------- = ---------------------------- = 3.02
Mc 315.000
3.02
K = 0.104 x ( 1- --------- )
10
K = 0.0726
392 of 392