The document contains two tables that provide cycle time data for loading equipment at Bukit Everest. The first table shows cycle times for top loading over 30 cycles, including times for digging, swing/filling, dumping, and empty swing. It calculates the total, average, and cycle time in seconds and minutes for top loading. The second table provides the same data for 30 cycles of bottom loading.
The document contains two tables that provide cycle time data for loading equipment at Bukit Everest. The first table shows cycle times for top loading over 30 cycles, including times for digging, swing/filling, dumping, and empty swing. It calculates the total, average, and cycle time in seconds and minutes for top loading. The second table provides the same data for 30 cycles of bottom loading.
The document contains two tables that provide cycle time data for loading equipment at Bukit Everest. The first table shows cycle times for top loading over 30 cycles, including times for digging, swing/filling, dumping, and empty swing. It calculates the total, average, and cycle time in seconds and minutes for top loading. The second table provides the same data for 30 cycles of bottom loading.