Project: MISSION SURE

! "# $%& ' &&" (%&&

End User Training Manual

for

SAP PP Production Planning & Control

Process Name: Production Execution Capacity Planning


(T-code CM01)

Process No: TRF/O2C/6.0

Control Copy No: TRF/O2C/6.0/

#) * #
Doc Version Description Prepared by Date Reviewed by Approved by
00 Original Palani Dorai 24.12.2009 AK Anal,
Sachin Kumar Rajak,
Minu Singh
Project: MISSION SURE

Introduction

The Production Planning and Control functional area in TRF has the following
business processes.

%
% +
!

" ! # $ % &# $

' " ( $$ $

" ! # &# $

" ) ! # #

For each of the above processes, there are separate End User Training Manuals are
available

This End user Training manual covers from sl. no. 5 of the above list, that is, the
Capacity planning of the Production Execution process

a) Capacity planning - Transaction code CM01

TRF/O2C/6.0 ' &&" (%&&

Page 2 of 13
Project: MISSION SURE

1. Capacity Planning - Transaction code CM01


Procedural Steps

Menu Path

To access CM01, use the following menu path


SAP Easy Access > SAP menu > Logistics > Production > Capacity planning >
Evaluation > Work center View > CM01 - Load

Transaction Code
CM01

Procedure
Enter the Transaction code CM01 in the command field (as shown in the below
screen)

Or go as per the navigation shown below and click CM01 Load

TRF/O2C/6.0 ' &&" (%&&

Page 3 of 13
Project: MISSION SURE

Press <Enter> key or click on the check mark icon in the top left side corner of the
Screen, the following screen Project Builder screen appears.

TRF/O2C/6.0 ' &&" (%&&

Page 4 of 13
Project: MISSION SURE

1) Key-in the work center value in the Work Center field. We have keyed in 102005 as the
work center value in the work center field.

2) Key-in the Plant number in the Plant field. We have keyed-in 1000 for this field.

The screen will look as shown below

TRF/O2C/6.0 ' &&" (%&&

Page 5 of 13
Project: MISSION SURE

Click on the check mark button, the following screen will appear

TRF/O2C/6.0 ' &&" (%&&

Page 6 of 13
Project: MISSION SURE

Select the first week, as shown below

TRF/O2C/6.0 ' &&" (%&&

Page 7 of 13
Project: MISSION SURE

And click on the Cap. Details / period push button, the following
screen appears

TRF/O2C/6.0 ' &&" (%&&

Page 8 of 13
Project: MISSION SURE

Planned
Orders

Production Orders

Click on the Choose Fields push button to display any other fields, the
following pop up window appears.

TRF/O2C/6.0 ' &&" (%&&

Page 9 of 13
Project: MISSION SURE

Scroll this bar


up and down

Scroll the slide bar of the Field column up and down to locate the field. We have located
the field name Material Description.
Select (click once) this field and

Click on the left side arrow button to move this selected field to the Selected Field
column.(Refer screen below, the Material Description field is moved to the Left Hand Side)

TRF/O2C/6.0 ' &&" (%&&

Page 10 of 13
Project: MISSION SURE

Click on the check mark button of the pop up window, the following screen appears
showing the description also.

Return back to the earlier screen by clicking the left side arrow , the following screen
appears

TRF/O2C/6.0 ' &&" (%&&

Page 11 of 13
Project: MISSION SURE

Click on the Standard View button, to the see the details in the graphical form.
The following pop up window appears.

Return back to the Home Screen or SAP Easy Access Screen.

End of document on T-code CM01 Load

End of document on Production order Confirmation - (TRF/O2C/6.0) 002

TRF/O2C/6.0 ' &&" (%&&

Page 12 of 13