Typical Section of Foundation Beam: (Both Ways: Top)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

2'-6"

2'-6"
+ (3 NOS. EXT.) 25
2'-6"
BARS (TOP)
2'-6"
(TOP)

(TOP)
Stirrups @ 4" c/c
Stirrups @ 4" c/c
Stirrups @ 6" c/c
Stirrups @ 4" c/c
2'-0"

2'-0"

2'-0"

2'-0"

RAFT RAFT
RAFT RAFT
RAFT RAFT RCC (M20)
RAFT RAFT RCC (M20)
RCC (M20)
RCC (M20)
LEAN CC
LEAN CC
(M10)
LEAN CC (M10)
LEAN CC
(M10) WELL-COMPACTED
(M10) WELL-COMPACTED
STONE SOLING
WELL-COMPACTED STONE SOLING
WELL-COMPACTED
STONE SOLING +
STONE SOLING
(BTM)
+

(BTM) X-SEC of Foundation Beam FB1 at Midspan X-SEC of Foundation Beam FB2 at Supports X-SEC of Foundation Beam FB2 at Midspan
3
3 4 "=1'-0"
3 4 "=1'-0"
4 "=1'-0"
X-SEC of Foundation Beam FB1 at Supports
3
4"=1'-0"

2'-6"
2'-6"
2'-6"

2'-6"
+(2 NOS. EXT.)25 BARS
(TOP) (TOP) (TOP)

Stirrups @ 4" c/c Stirrups @ 4" c/c Stirrups @ 6" c/c


Stirrups @ 6" c/c

RAFT RAFT RAFT RAFT RAFT RAFT


RAFT RAFT
RCC (M20) RCC (M20) RCC (M20)
RCC (M20)

LEAN CC LEAN CC LEAN CC


LEAN CC (M10) (M10)
(M10)
(M10)
WELL-COMPACTED WELL-COMPACTED WELL-COMPACTED
WELL-COMPACTED STONE SOLING STONE SOLING
STONE SOLING
STONE SOLING
+ +

(BTM) (BTM) (BTM)


(BTM)

X-SEC of Foundation Beam FB3 at Supports X-SEC of Foundation Beam FB3A at Supports X-SEC of Foundation Beam FB3A at Midspan
3
4"=1'-0" X-SEC of Foundation Beam FB3 at Midspan 3
4 "=1'-0" 3
4 "=1'-0"
3
4 "=1'-0"

2'-6"

2'-6" 2'-6"
2'-6"

+(3 NOS. EXT.) 25 BARS (TOP)


(TOP) (TOP) (TOP)

Stirrups @ 4" c/c


Stirrups @ 4" c/c Stirrups @ 6"c/c Stirrups @ 6" c/c

RAFT RAFT
RAFT RAFT RAFT RAFT RAFT RAFT
RCC (M20)
RCC (M20) RCC (M20) RCC (M20)

LEAN CC
LEAN CC LEAN CC (M10) LEAN CC
(M10) (M10) (M10)
WELL-COMPACTED
WELL-COMPACTED WELL-COMPACTED STONE SOLING WELL-COMPACTED
STONE SOLING STONE SOLING STONE SOLING
+ +
(BTM)
(BTM) (BTM)
(BTM)

X-SEC of Foundation Beam FB4 at Midspan X-SEC of Foundation Beam FB5 at Supports
X-SEC of Foundation Beam FB4 at Supports 3 X-SEC of Foundation Beam FB5 at Midspan
4 "=1'-0" 3
3 4 "=1'-0"
4 "=1'-0"
3
4 "=1'-0"

(Both Ways:
2'-0"

2'-0"
+ (2 NOS. EXT.) 16 BARS
(TOP)
(TOP) Top)
Stirrups @ 6" c/c
Stirrups @ 6" c/c
RCC (M20)

RAFT RAFT
RAFT RAFT
RCC (M20)
10" (Both Ways:
Bottom)
RCC (M20)

LEAN CC
LEAN CC (M10)
(M10) LEAN CC
WELL-COMPACTED
WELL-COMPACTED
STONE SOLING
STONE SOLING (M10)
EXCAVATION LEVEL
(BTM) WELL-COMPACTED
(BTM)
(-)6'-0" LVL
STONE SOLING
X-SEC of Foundation Beam FB6 at Midspan
X-SEC of Foundation Beam FB6 at Supports
TYPICAL SEC THRO' MAT(RAFT) FOUNDATION SLAB
3
4 "=1'-0"
3
4 "=1'-0"

3
4"=1'-0"

DRWG TITLE

FOUNDATION BEAM
DETAIL

L1 L2

(4 Legged) BARS
(Cont:Top)
COLUMN COLUMN
CONSULTANT

(2 NOS)

Ld BARS BARS
(Extra: (Extra:
Ld Btm)) Btm))

BARS 1
(Cont:Bottom) 4 (L2)
1 ( L1) 1 ( L1) (but not less than Ld)
4 4
In case of
(but not less than Ld) (but not less than Ld)
Overhangs/Cantilevers:
Full Length
JOB NO 2013-RB4 DATED 12-11-13
SUPPORT STIRRUPS MID SPAN STIRRUPS SUPPORT STIRRUPS SUPPORT STIRRUPS
1 (L1) 1 (L1) 1 (L1) 1 (L2) DRN CHK
3 3 3 3

DES APP
TYPICAL SECTION OF FOUNDATION BEAM

You might also like