(WiFi Off-load Project) WIFI Hotspot Site Commissioning Report (To be filled up by BSNL)
1. Hotspot Name & ID : GORANTLA TE, USAPATP00001
2. Circle : AP 3. SSA : ATP 4. Hotspot Location with Land mark : GORANTLA TE 5. No. of Access Points Installed : 1 OD (a) (Indoor/Outdoor)/serial No/Mac Id/IP Address of AP1 : Outdoor/FGL2052B0RK/10.172.150.224 6. Details of the PoE switch with serial No (If Used) : FOC2051Y0PC 7. Details of 1KVA UPS with S. No. : 8312L1702102149 8. Rack enclosures (a). For Indoor Hotspots : (b) For Outdoor Hotspots : OUTDOOR 9. WiFi Hotspot commission date : (a) Hotspot site handover date : (Date of Approval by CGM) (b). Hotspot commission date : 29.08.2017 10. AT Completed (Yes/No), please Enclose AT report : YES 11. Contact Details of the officer in charge of the hotspot : (Name, Designation, Mobile Number)