We are from group 7 in for subject BFC31602 CONTRACT AND ESTIMATION section 2.

For this
activity we going site visit at project PEBINAAN UNVERSITI TUN HUSSEIN ONN MALAYSIA (UTHM)
FAKULTI KEJURUTERAAN ELEKTRIK DAN ELEKTRONIK. The client of this project is KEMENTERIAN
PENDIDIKAN TINGGI and the contractor for this project is PEMBINAAN HAMID ABD. RAHMAN EKOVEST
CONSTRUCTION SDN BHD. This project started from 30/11/2015 and will be finish on 25/02/2018. From
our observation at this site they still do an infra works like drainage work excavation work and little bit
do a mechanical and electrical work at the body of the structure building.

From this site visit, we know that this building some of the building process they used a
Industrialized building system (IBS) and also conventional system. At our observation we know that the
drainage work the drainage cover they used an IBS concept. This construction also have a site office and
safety officer to observe all the employer work follow the procedure when do a work at outside or
inside the building.