Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

IEEE-485 STT Battery

Sizing Program
Customer : Date :

Project/Site : Sized By :

C or F? : F End voltage (V/cell) : 1.75


Min. System Temp. : 77 Number Of Cells :
Temp. Corr.Factor (TF) : 1.00 V Max :
Design Margin (DM) : 1.10 V Min :
Aging Factor (AF) : 1.25 V Nom :

Load (A) Duration (min) Duty Cycle


Period 1 1
1
Period 2 1
1
Period 3
1

Period 4 1
Load (A)
0
Period 5 0
0
0
Version 1.0 0 Created 7/15/2011
0 0 0 0 0 1 1 1 1
Duty Cycle
1
1
1
1
1
1
Load (A)
0
0
0
Period 6 0
0
Period 7 0 0 0 0 0 1 1 1 1
Time (min)

Random System Load Profile

USxTFxDMxAF : Req. # of Pos. Plates : Use SBS Type :

Version 1.0 Created 7/15/2011


IEEE-485 STT Battery
Sizing Program
Load Change In Load Duration of Period Time To End of Section Amps/Pos
Period
(Amperes) (Amperes) (Minutes) (Minutes) Plate

SECTION 1
1 A1= A1-0 = M1= T=M1=
Sec 1 Total
SECTION 2
1 A1= A1-0 = M1= T=M1+M2=
2 A2= A2-A1= M2= T=M2=
Sec 2 Total
SECTION 3
1 A1= A1-0 = M1= T=M1+M2+M3=
2 A2= A2-A1= M2= T=M2+M3=
3 A3= A3-A2= M3= T=M3=
Sec 3 Total
SECTION 4
1 A1= A1-0 = M1= T=M1+...M4=
2 A2= A2-A1= M2= T=M2+M3+M4=
3 A3= A3-A2= M3= T=M3+M4=
4 A4= A4-A3= M4= T=M4=
Sec 4 Total
SECTION 5
1 A1= A1-0 = M1= T=M1+...M5=
2 A2= A2-A1= M2= T=M2+...M5=
3 A3= A3-A2= M3= T=M3+M4+M5=
4 A4= A4-A3= M4= T=M4+M5=
5 A5= A5-A4= M5= T=M5=
Sec 5 Total
SECTION 6
1 A1= A1-0 = M1= T=M1+...M6=
2 A2= A2-A1= M2= T=M2+...M6=
3 A3= A3-A2= M3= T=M3+...M6=
4 A4= A4-A3= M4= T=M4+M5+M6=

Version 1.0 Created 7/15/2011


5 A5= A5-A4= M5= T=M5+M6=
6 A6= A6-A5= M6= T=M6=
Sec 6 Total
SECTION 7
1 A1= A1-0 = M1= T=M1+...M7=
2 A2= A2-A1= M2= T=M2+...M7=
3 A3= A3-A2= M3= T=M3+...M7=
4 A4= A4-A3= M4= T=M4+...M7=
5 A5= A5-A4= M5= T=M5+M6+M7=
6 A6= A6-A5= M6= T=M6+M7=
7 A7= A7-A6= M7= T=M7=
Sec 7 Total
Random Equipment Load Only (if needed)
R AR= AR-0= MR= T=MR=

Maximum Section Size + Random Section Size = Uncorrected Size (US)

USxTFxDMxAF : Req. # of Pos. Plates : Use SBS Type :

Version 1.0 Created 7/15/2011


IEEE-485 STT Battery
Sizing Program
October 4, 2017

Duty Cycle
1
1
Small
1
###
1
###
1
###
1 ###
0 ###
0 ###
0 ###
0
0 Version 1.0 Created 7/15/2011
0 0 0 0 0 1 1 1 1 1 1
Duty Cycle
1
1
1
1
1
1
0
0
0
0 ###
0 ###
0 0 0 0 0 1 1 1 1 1 1 ###
Time (min) ###
###
System Load Profile ###
###
###
###
###
###

Version 1.0 Created 7/15/2011


IEEE-485 STT Battery
###
###
###
Sizing Program ###
###
###
Reqd. Number of Positive
Plates
###
Small
###

###
###
###

###
###
###

###
###
###
###

###
###
###
###
###

###
###
###
###

Version 1.0 Created 7/15/2011


###
###

###
###
###
###
###
###
###

###

Pos. Plates
Size Group
Small

Version 1.0 Created 7/15/2011

You might also like