BP Mar, 2013 FSR Well 22
BP Mar, 2013 FSR Well 22
FSR# 2234
Customer BGTT Date 10: 04: 2014
Platform Dolphin Rig
Page 1 of 2
surface packing. Installed new packing, race,
bearings and dowel pin. Installed old bearing
cap.
19:35hrs 19:50hrs
Opened lower master, actuated upper master and
manual wing valve observed 2003psi on flow
line. Tested manual wing valve in the open
position for external leaks for 15mins. Ok.
12/4/2014 Depart from location.
----------------------------------------------
-----------------------------------Cameron Representative
Customer Representative
Page 2 of 2