FIELD SERVICE REPORT

FSR# 2234
Customer BGTT Date 10: 04: 2014
Platform Dolphin Rig

Well Number DAP 7 Company Suresh Balraj


Representative
Equipment Type 5 1/8 5k Cameron Manual Gate Job Ticket Reference
Valve No.
Service Jerome Chong. Stage of Job
Personnel

Date Wellhead Related Activities Item Part Serial


Number Number
10/4/2014 13:45hrs
Arrived on location.
13:45hrs 15:00hrs
Did platform induction.
15:00hrs 16:00hrs
Discussed job with BGTT company
representative.
18:00hrs 19:30hrs
Did permit to work.
11/4/2014 6:00hrs 6:15hrs
General tool box talk.
7:50hrs
Valve parts arrived on board via helicopter.
7:50hrs 12:15hrs
Awaiting approval of permit.
12:15hrs 12:30hrs
Tool box talk for replacing valve packing. 5 1/8 5k 141555-
12:30hrs 17:00hrs Cameron 31-03-10
Checked for trapped pressure in bore of valve Manual Gate
and flow line. Observed 0psi. Removed valve Valve
handle and back seat valve. Installed bleed tool
and checked for trapped pressure in valve cavity.
Removed body grease fitting and 1/4 check
from grease port. Installed gauge manifold on
grease port and tested to 3000psi for 5mins Ok.
Removed bearing cap, race, bearings and dowel
pin and packing gland. Pumped out packing.
Clean and inspect stem and bonnet sealing

Page 1 of 2
surface packing. Installed new packing, race,
bearings and dowel pin. Installed old bearing
cap.
19:35hrs 19:50hrs
Opened lower master, actuated upper master and
manual wing valve observed 2003psi on flow
line. Tested manual wing valve in the open
position for external leaks for 15mins. Ok.
12/4/2014 Depart from location.

----------------------------------------------
-----------------------------------Cameron Representative
Customer Representative

Page 2 of 2