1. Project Background
Project Name Provision of Hook Up and Commissioning
for F9JT-A Infill Drilling Project
Project W/O No. DFHD/2014/041A/004
Project Period (1st Mob Pre-Siprod) 10th August 2015 24th August 2015
Project Period (2nd Mob Rig-Up) 16th October 2015 31st October 2015
Project Period (3rd Mob Rig-Down) 2nd December 2015 7th December 2015
Project Period (4th Mob Well Tie-In) 1st March 2016 19th March 2016
Project Duration 56 Days
Project Manhours (Offshore) 39,012 Mhrs
Project Marine Spread Perdana Sovereign, Nautical Adlin, Grade
One Marin (GOM 6), Petra Galaxy
A. Leading Indicators
No Performance Indicators Measurement Target Actual
1 HSE Plan Actual VS Base HSE Base HSE
Implementation Planned Plan 80% Plan 97%
Key HSE Key HSE
Plan 100% Plan 100%
2 Management HSE Visit Actual VS Once Off 28/12/2016
Planned
3 UAUC Reporting Ratio of UAUC 1:150 1:90
reported over
manhours
worked
4 Behavioural Safety Ratio of BS 1:2000 1:673
Reporting reported over
manhours
worked
5 ZeTo Rules Audit Ratio of audit 1:5000 1:975
conducted
over manhours
worked
6 PTW Verification Ratio of 1:5 1:3
verification
over total PTW
issuance
Rev.0 (6/2014)
B. Lagging Indicators
No Performance Indicators Measurement Target Actual
1 Lost Time Injury No. of lost time 0 0
Frequency (LTIF) injuries per
1,000,000
manhours
worked
2 Total Recordable Case No. of injurious 0.65 0
Frequency (TRCF) incidents per
1,000,000
manhours
worked
C. Other
No Performance Indicators Measurement Target Actual
1 Number of compounds 0 0
from authorities due to
non-compliance
Attachment 1
B. Summary
C. Attachment
i. Program Agenda.
ii. Copy of attendance list.
iii. Copy of verified UDAT report.
iv. Pictorial evidence.