Topic 1: Contract

1.1 Introduction Contract agreement between two parties


1.2 Work scope
1.3 Payment Method

Topic 2: Road/ Bridges/ Waft


1.
2.
2.1 Construction & Maintenance
2.1.1 Design pavement thickness
2.1.2 Machineries & Material
2.1.3 Suitable pavement type due to long serviceability period, low cost
2.1.4 Drainage system suitable drainage/ is it necessary to provide drainage
2.1.5 Suitable maintenance patches/ use sealant
2.2 Traffic management

Topic 3: Building
3.1 Drawing
3.2 Bill of Quantities
3.3 Cost Estimation

Topic 4: Quality Assurance & Quality Control


4.1 Quality Assurance
4.2 Quality Control