STRAIGHT LINE DIAGRAM

Post Ondoy and Pepeng Short Term - Replacement of Balanak Bridge


along Lucban - Luisana - Pagsanjan Road, Laguna I, Region IV-A

Sta. 00+000

Sta. 00+040

Sta. 00+060

Sta. 00+080

Sta. 00+100

Sta. 00+120

Sta. 00+140

Sta. 00+160

Sta. 00+180

Sta. 00+200

Sta. 00+220

Sta. 00+240

Sta. 00+260

Sta. 00+280
Sta. 0+020

End of Proj.
Sta 00+000
Beg. of Proj.
Sta 00+000

Back of Backwall
Back of Backwall

Sta 00+177.632
Sta 00 + 96.992

End of Bridge
Beg. of Bridge
Beg. of Slope

Sta 66+130
Protection
Slope Protection
ORIGINAL

PCCP Bridge Approach

ABUT B
ABUT A
Bridge
Bridge
PCCP Bridge Approach
Slope Protection

End. of Slope
Beg. of Slope

Sta 00+000
Sta 00+000

Protection
Protection

Slope Protection
PCCP Bridge Approach
V.O. 1

Bridge
Bridge
PCCP Bridge Approach
Slope Protection

Slope Protection
PCCP Bridge Approach
F.V.O.

Bridge
Bridge
PCCP Bridge Approach
Slope Protection

LEGEND

DELETION OF ITEM 103(1), 404, 405, 509, 605, 612(1)(Yellow), 612(1)(White)

ADDITION OF ITEM 506: Stone Masonry and ITEM 601: Curb and Gutter

INCREASE IN ITEM 405: Structural Concrete Class "A"

DECREASE IN ITEM 101(1), 101(3), 102(2), 103(1), 104(2), 200, 201, 202, 301, 311, 404a, 404b, 505(5), 507, 600

CONTRACTOR DPWH
Prepared and Submitted by: Concurred by:

Project Manager Project Manager