Professional Documents
Culture Documents
GRP Puddle Pipe Specification
GRP Puddle Pipe Specification
GRP Puddle Pipe Specification
1. Scope:
This specification covers the requirements GRP puddle pipes for WTP Structures
- Pre-treatment Area
- Clarified water Storage Tank
- SWRO Reject Water Tank
- N Pit
- Bulk Acid and Caustic Storage Area
- Pre-treatment Chemical Building
- Sludge Sump
3. Bill of Quantity (BOQ) of Puddle Pipe: For Detail Bill of Quantity (BOQ), please refer
attached drg