FROM

TOTAL
TO PHYSICAL
ITEM ACTIVITY UNIT SCOPE DONE TO
(CHAINAGE) (CHAINAGE) WEIGHT PROGRESS
DATE
(%)
0+000 4+500 4.5
Site clearance Km 35 13.3 5.054
0+000 8+800 8.8

0+000 4+500 4.5


Top soil
Km 35 7 2.66
2 stripping &
spoil

0+000 8+800 8.8

0+000 4+500 4.5


Earthworks(fi
3 Km 35 8 3.04
ll)
0+000 8+800 8.8

0+000 4+500 4.5


Earthworks(C
4 Km 35 8 3.04
ut)
0+000 8+800 8.8

0+000 4+500 4.5


5 Subgrade Km 35 8 2.86
0+000 8+000 8

Km 35 0+000 4+500 4.5 8 0.0


6 Subbase
0+000 2+380 2.38

7 Base
km 35 0+000 4+500 4.5 9 1.16

8 Prime Coat 0+000 4+500


km 35 4.5 5 0.64

1st Seal
9
(14/20) km 35 4.5 5 0.64

2ND Seal
10
(6/10) km 35 4.5 5 0.64
Cross pipe
11 culvert
(1200mm) m 271 0 5 0

Cross pipe
12 culvert
(900mm) m 1680 0+000 3+500 46 5 0.14
Access pipe
13 culvert
(600mm) m 840 0+000 3+500 420 5 2.50
Road
14 Km 35 0 5 0
Furniture
100 22.37
FROM
TO
ITEM ACTIVITY UNIT SCOPE TOTAL PHYSICAL
(CHAINAG (CHAINAG
E) DONE TO WEIGHT PROGRESS
E)
DATE (%)

Site clearance
1 Km 34 0+000 10+800 10.8 7 2.22

Top soil stripping


& spoil
2 Km 34 0+000 10+800 10.8 7 2.22

Earthworks(fill)
3 Km 34 0+000 10+400 10.4 8 1.65

Earthworks(Cut)
4 Km 34 0+000 10+400 10.4 8 2.45

Subgrade
5 Km 34 0+040 9+500 9.5 8 2.24

Subbase 0+000 3+500


6 Km 34 3.5 8 0.82

Base
7 km 34 1+300 3+420 2.1 9 0.56

Prime Coat
8 km 34 0+000 3+420 3.5 5 0.51

1st Seal (14/20)


9 km 34 0+000 2+980 2.9 5 0.43

1st Seal (6/10)


10 km 34 0+000 2+700 2.7 5 0.40

Cross pipe culvert


(1200mm)
11 m 263 0+000 6+700 0 5 0.00

Cross pipe culvert


(900mm)
12 m 1632 0+000 6+700 193 5 0.59

Access pipe
culvert (600mm)
13 m 816 0+000 6+700 340 5 2.08

Road Furniture
14 Km 34 0 5 0.00
100 16.17