ORIENT EXPRESS SHIP MANAGEMENT LTD

HOT WORK PERMIT

M.V. : Date: Port:


Relating to any work involving temperatures that could cause ignition of combustible gasses, liquids,
vapours or other inflammable substances in or adjacent to the area involved.

1. General :
This permit is valid from hrs on to Hrs on
Permit issued by :
Location of work:
Description of work :
Person/s carrying out the work Rank :
Rank :
Rank :
Responsible person in attendance :

2. Prior to carrying out hot work :


A. Permit required Yes No
Is enclosed space entry permit required ?
Has enclosed space entry permit been issued?
Is electrical isolation permit required?
Has electrical isolation permit been issued?
Are other permits required? (specify)
Have other permits been issued?
Has location of repairs been verified from structural drawings

B. Applies to all hazardous work not involving naked flame or continuous spark
production, and would include use of electrical equipment, use of air driven rotary
equipment, lifting equipment/materials over operating plant
Has work area been checked for hydrocarbon vapours with a combustible gas
indicator?
Were the results satisfactory?
Is additional ventilation required?
Has surrounding area been made safe? (combustible materials/cargo removed, covered)
Is personal protective equipment required?
Is personal protective equipment on board / in use?
Were results satisfactory?

C. Applies to all hot work involving high temperatures open flame, continuous source
of sparks, etc. Tests for combustible gas should be carried out immediately before
commencement and at frequent intervals as long as the work is in progress.
Has work are been checked for hydrocarbon vapours with a combustible gas indicator?

Is additional ventilation required?


Has additional ventilation been provided?
Have equipment/pipelines been : Drained
Form No.: SC 03 01ST Sept 2014 REV NO 00
Page No: 1 OF 2
ORIENT EXPRESS SHIP MANAGEMENT LTD
HOT WORK PERMIT
Purged
Blanked
Is equipment / pipelines free of liquid
Is surrounding area safe/free from hazards?
Is additional fire protection available?
Is electrical equipment properly isolated?
Is personal protection equipment required?
Is adequate personal protection equipment provided and in use?

Signed : Signed :
Master Responsible Officer
(Ch Eng for Engine Dept or Ch Off for Deck Dept)

Form No.: SC 03 01ST Sept 2014 REV NO 00