This house complaint form documents issues reported by Mohd Dzul Fazdli Ahmad for his property in Kota Seriemas Phase 14.3 Lot 41. The issues include a leaking master bedroom toilet, cracked wood floor panels in the master bedroom that could further crack, and a gate that needs proper welding. All complaints will be addressed within 30 days, and rectification works may be delayed if access to the property is not provided.
This house complaint form documents issues reported by Mohd Dzul Fazdli Ahmad for his property in Kota Seriemas Phase 14.3 Lot 41. The issues include a leaking master bedroom toilet, cracked wood floor panels in the master bedroom that could further crack, and a gate that needs proper welding. All complaints will be addressed within 30 days, and rectification works may be delayed if access to the property is not provided.
This house complaint form documents issues reported by Mohd Dzul Fazdli Ahmad for his property in Kota Seriemas Phase 14.3 Lot 41. The issues include a leaking master bedroom toilet, cracked wood floor panels in the master bedroom that could further crack, and a gate that needs proper welding. All complaints will be addressed within 30 days, and rectification works may be delayed if access to the property is not provided.
Name: MOHD DZUL FAZDLI AHMAD Township: Kota Seriemas HOVP Date: Signature: Phase No: 14.3 DLP Period: Lot / Unit No: 41( no 94) DLP Expiry Date: Date: 31.12.2016 Contact No: 0125767361 No of Hse Keys:
NO FLOOR - LOCATION/AREA DESCRIPTION OF DEFECTS STATUS FLOOR LAYOUT
1 Master bedroom toilet leaking 2 Master bedroom Wood floor panel cracked Anytime can cracked. Need to proper 3 Gate welding back
NOTE: All complaints will be attended within 30 days.
Rectification works may be delayed should you fail to arrange access to your property (House Keys). Rectification works shall be deemed accepted if purchaser did not sign the acceptance of work done after 7 working days of completion date.
CONTRACTOR SECTION (PMS) SECTION (PIS) OF WORK DONE Tick: ( ) Very Good ( ) Good Signature: Signature: Signature: ( ) Satisfactory ( ) Unsatisfactory Signature: Date Completed: Received By: Received By: Received By: ANUAR-0162139854 No of Keys Position: Date Received: Date Received: I/C No: Received: Date Date Start Work : Date Start Work : Date: Received :