AND WORK
SPECIFICATION
SUMMARY
PREPARED BY:
All parts of the construction shall be finished with first class workmanship,
to the fullest talent and meaning of the plans and these Specifications, and to the
entire satisfaction of the Architecture/Engineer and the Owner. The construction
shall conform to all the requirements of the National Building Code, as well as the
local rules and regulations of the City of Paraaque, Philippines.
Materials Designation
A. CONCRETE and MASONRY WORKS
ROOFING WORKS
D. FLOOR FINISH
E. TOILET FINISH
H. PLUMBING WORKS
1. Water Closet (pozzi) 1. All toilets shall have water closet with flush.
2. Lavatory 2. All toilets shall have lavatory.
3. Kitchen Sink 2 base 3. Requirements for kitchen and dirty kitchen.
4. Orange PVC Pipe (NELTEX/ Emerald) 4. For all drainage water line and sanitary line
and Fittings
5. Blue PVC Pipe 5. For all cold water line.
I. ELECTRICAL WORKS
1. All lighting fixtures akari 1. Decorated lighting fixtures and pin light.
2. All outlets 2. For all outlets akari, royu, or national outlets.
3. #8 THWN stranded wire 3. For main line.
4. #10 THWN stranded wire 4. For all aircon line.
5. #12 THWN stranded wire 5. For all convenience outlet
6. #14 THWN stranded wire 6. For all lightning outlet
K. PAINTING WORKS
1. Elestomeric (sun and rain) 1. For interior and exterior paint, colors may
depend on the likes of the owner.
2. Flat wall enamel (boysen) 2. For all ceiling paints, mansory based.
3. Quick dry enamel 3. For all grills metal and wood surface.