Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 1

1.

Prepare E-R diagram

2. Draw data flow architecture diagram

3. data Preparation - data cleansing

4. Data ingestion

5. Data processing

6. data integration

7. data visualization .

8. Need all candidates browsing history for next two days (for next task)

9 . monitor your jobs at 8088 -rm , 8080 -spark master,4040 -spark worker and note
down the statistics (time taken,memory utilization)

10. Prepare timesheet in excel and mention time taken for each task .

11. End of the day ,list completed and pending task .

12. Document your work then and there with screenshots

13. Have to justify your logic and code/command at the time of review .

You might also like