Guide wor Deviation Possible Cause Consequence Action Required

Ensure
good
communi
cation
with
intermedi
ate
storage
operator
Install low
level
alarm on
Flow No No hydrocarbon available at intermLoss of feed to plant D-100
P2 pump fails Loss of feed to plant Install low level alarm on settling tank D-100

Install low
level
alarm on
settling
tank D-
100
Install
kickback
on P2
pump
Check
design of
pump
Loss of feed to plant strainer
Line blockage P2 pump overheats

Loss of feed to plant


Isolation valve closed P2 pump overheats

Loss of feed to plant


LCV V-3 fails shut P2 pump overheats

Loss of feed to plant


Hydrocarbon
discharged into
Line fracture environment Regular patrolling and inspection of transfer line
Settling tank
overflows
Incomplete
separation of water
phase in settling
LCV V-3 fails open tank, resulting in
More Flow LCV bypass line open in error process upset
Pressure P2 pump running but isolation valve closed in error or LCV V-3 fails close
m on settling tank D-100

nd inspection of transfer line