Hoist and Auxiliary Equipment
Hoist and Auxiliary Equipment
12. Overhead electric hoist equipment should be installed so that the workers would not
Industrial Trucks/Forklifts
Spraying Operations
areas.
6-10. Yes
14-16. Yes
Hand Tools and Equipment
1. All tools and equipment should be maintained in good condition for efficiency.
4-11. Yes
avoid damages.
2-11. Yes
1. Work rests should be installed and kept adjusted to within 1/8 inch of the wheel.
2. The adjustable tongue on the top side of the grinder should be used and kept
3. Side guards should cover the spindle, nut, and flange and 75 percent of the wheel
diameter.
4-13. Yes
Power Actuated Tools
1-6. Yes
Machine Guarding
conducted.
4. All machineries and equipment should be kept clean and properly maintained.