1.1 OBJECTIVE.
A key objective of ADC Procedures is to set up a step by step way of handling the
job. It is also an analysis of associated hazards pertaining to the jobs and measures to
minimize the risks.
This procedure has developed to be applied and discussed before each job listed in
the contents.
1.2 SCOPE.
1.3 RESPONSIBILITY.
It is the responsibility of the Tool-pusher and Rig Manager to insure all listed
operations are executed in a safe and efficient manner. It is their responsibility to
conduct a Pre-job Safety Meeting and discuss and review the related JSA, prior to
starting each operation.
Tool-pusher is responsible to ensure that each work permit has its dedicated JSA
attached to.
The Rig Sup. is accountable for keeping this document up-to date.
The JSA date and the crew should be same as Work Permit date and crew.
Author:
Arabian Drilling REF: 25
Company
Checked By
Rig Specific Page
Procedure
Approved By:
AD - 32 Issued: April 2008
Table of Contents
TASK ANALYSIS
- Position
- Position
- Position
- Position
- Position
- Position
-
Additional Comments:
Author:
Arabian Drilling REF: 25
Company
Checked By
Rig Specific Page
Procedure
Approved By:
AD - 32 Issued: April 2008
Preparation
Tools
Safety Valve
Gray Valve
Adequate Crossover Subs
Handling wheel
Closing/Opening key lever
Lifting cap
Air Tugger
Manual Tongs correctly set
Procedure
2. The tool joint set on slips must be 2 feet above the drill floor level.
3. If you are Running / Pulling Out drill pipes in the well, follow the instructions from 4
to 11.
Author:
Arabian Drilling REF: 25
Company
Checked By
Rig Specific Page
Procedure
Approved By:
AD - 32 Issued: April 2008
Note: In case of H2S alarm while well flowing, the floormen should first go to put their
Escape Pack, connect to the cascade system then taking care of closing the well.
5. Once hand tight, close the Full Opening Safety Valve with the key lever.
8. Stab, Spin and Torque the Gray valve on top of the Full Opening Safety Valve.
12. Flow checking at the top of BHA when pulling the drillstring out of hole is a good
time to make up the Full Opening Safety Valve with the required crossover sub. The
assembly must be in the following configuration :
a. The Safety Valve in OPEN position,
b. The handling wheel installed on the Safety Valve
c. A lifting cap installed on the Safety Valve, connected to an air tugger line
ready to be lift up.
13. When a kick is confirmed while pulling out / running in hole the BHA, follow the
instructions 14 to 22.
14. One floorman operates the tugger while 2 floormen are in charge to stab and hand
tight the assembly (Crossover+Safety Valve) on the tubular in the slips, using the
handling wheel.
15. Close the Full Opening Safety Valve with the key lever.