BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2

Generator Gas Room-Pile Calculations A-A1.1

ANALYSIS OF 2 - PILE GROUP - PC2


Mx
Design Data :
Load Case 100 DL+LL Joint No 0 Mz
Grid Mark 0
Y
Column Z
Load
x 0
z 0 750
Fy 356.1 356.145 P2 P1 1500
Fz 0.102 0.102 750
Mx -0.025 -0.025
Fx -2.762 -2.762
Mz 6.835 6.835 575
500 1500 500

2500
Depth of pile cut off from top of
pedestal dforc 2.00 m Pedestal Size
Depth for overburden pressure (soil) df 1.70 m Dimension in x direction 0.50
Unit Weight of soil gs 18.00 kN/m3 Dimension in z direction 0.50
Overburden Pressure wover 50.00 kN/m2
Weight of Paving Wpav 5.00 kN/m2
Depth of Pile Cap Dpc 1.00 m
No of Piles n 2 Nos.
Area of pedestal Apeach 0.25 m2
Total area of pedestal Ap 0.25 m2 223

Capacity of pile
Vertical Ppv 650 kN
Lateral Pph 65 kN
Pullout Ppp 100 kN
Increment Factor for Wind loads Fincw 1.25 Increment for current load case
Increment Factor for Seismic forces Fincs 1.25 finc = 1.25

Calculations :

Vertical Loads
Weight of Pedestal kN
Area of Pile Cap Apc l*b 3.75 m2
Apcnett = (Apc-Ap) 3.50 m2
Soil Weight Wsoil df *gs * Apcnett 107.10 kN
Overburden Wover wover * Apcnett 175.00 kN
Paving Wt Wpav * Apcnett 17.50 kN
Weight of encasement 6.25 kN
Self Weight of Pile Cap Wswpc Apc * Dpc * 25 93.75 kN
Self weight of pedestal Wp = Ap*(dforc-Dpc) 6.88 kN
Total SW 406.48 kN
Vertical Load Pv SFy + SW 762.62 kN

file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.2

CG of load system

Mxv S(Fy z) 0 v - represents vertical


Mxh SFz * dforc 0.204 moment
Mxm SMx -0.025 h - represents hori-
Mxt Mxv + Mxh + Mxm 0.179 kNm -zontal moment
m - represents column
Mzv S(Fy x) 0 moment
Mzh SFx * dforc -5.524
Mzm SMz 6.835
Mzt Mzv + Mzh + Mzm 1.311 kNm

ex Mzt / Pv 0.00 m
ez Mxt / Pv 0.00 m

Final Moment about X axis Mxf 0.179 kNm


Final Moment about Z axis Mzf 1.311 kNm

Pile Forces

Sl No Pile x z Pv / n Mxf*z/Sz2 Mzf*x/Sx2 Fp


Desig (m) (m) (kN) (kN) (kN) (kN)
1 P1 0.750 0.000 381.31 0.00 0.87 382.18
2 P2 -0.750 0.000 381.31 0.00 -0.87 380.44
SFp 762.62

Sx2 1.13 Max 382.18 kN


Sz 2
0.00 Min 380.44 kN

Check for Compressive Force

Max force in Pile 382.18 kN Safe


Permissible Compressive Force Finc * Ppv 812.5 kN

Check for Lateral Force

SHx -2.762 kN
SHy 0.102 kN
Resultant H sqrt( SHx2 + SHz2) 2.764 kN
Lateral Force per Pile H/n 1.38 kN Safe
Permissible Lateral force Finc * Pph 81.25 kN

Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary

Minimum compressive force 380.44 kN Safe


Permissible Tensile Force Finc * Ppp 125 kN

file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.3

m
m

file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.4

v - represents vertical

h - represents hori-
-zontal moment
m - represents column

file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-PART 2
Generator Gas Room-Pile Calculations A-A1.3

Joint 0 Grid A2
Factored Pile Reactions for
SUMMATION OF PILE REACTIONS Punching Shear Check
LOAD SECTION-1 & 4 SECTION-2 & 3 COLUMN
FACTOR P2 P1 LOAD P1 P2
1.5 364.14 363.77 118.20 363.77 364.14
1.5 364.14 464.65 320.07 464.65 465.14
1.5 465.14 573.28 534.22 573.28 570.65
1.5 570.65 273.22 -60.28 273.22 276.21
1.5 276.21 436.12 258.89 436.12 432.49
1.5 432.49 363.77 261.37 363.77 364.14
1.5 364.14 436.12 258.89 436.12 432.49
1.5 432.49 363.77 261.37 363.77 364.14
1.5 364.14 325.28 41.65 325.28 326.08
1.2 260.87 291.01 94.56 291.01 291.31
1.2 291.31 371.72 256.05 371.72 372.11
1.2 372.11 218.58 34.24 218.58 220.97
1.2 220.97 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89

364.14 363.77 534.22 363.77 364.14


291.31 291.01 -60.28 291.01 291.31

MAX VERTICAL LOAD = 534.22 kN


MAX PILE REACTION = 364.14 kN

piles within (ped + d/2) area = 0


= 0 kN
ACT VERT LOAD = 534.22 kN

file:///conversion/tmp/scratch/368927121.xls ]
DESIGN OF 2 PILE GROUP - PG2
SEC 1 SEC 2
JOINT 0
GRID 0

750
P2 P1
1500
750

500 1500 500

2500

DATA :

Pedestal Size : Grade :


Width B = 500 mm Concrete Grade, fck = 30 N/mm
Depth D = 500 mm Strength of Steel, fy = 390 N/mm
Height hped = #NAME? mm
Rebar and Cover:
Assuming the Dia of Main Bar = 20 mm
Clear Cover to the Tie Reinf. = 75 mm
Effective Cover 75+20/2 = 85 mm
Eff. Depth of Pile Cap deff = #NAME? mm

LOADS ON PILE CAP

Soil Weight = #NAME? kN/m2 Depth of soil filling = #NAME? m


Due to Grade slab = 5.0 kN/m2 unit wt. of Soil = #NAME? kN/m
Overburden load = #NAME? kN/m2 Thickness of PC = #NAME? m
Self Weigth of pile cap = #NAME? kN/m2 pile diameter = 400 mm
Total pressure = #NAME? kN/m2

ANALYSIS - MOMENTS AND SHEAR

Section 1
Max. factored pile reaction in piles P2 = 364.14 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor for pi
(+ve for pile outside the critical section)
Distance from face of Ped. to edge of PC = 1000 mm
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
Shear force at d/2 from face of pedestal
Critical shear section = #NAME? mm from face of column (As per cl34.2.4.1 IS456:2000)
Factor =
Shear force at critical section = #NAME?
= #NAME? kN

file:///conversion/tmp/scratch/368927121.xls,DSN(B) KM/ST 10/17/2017


Section 2
Max. factored pile reaction in piles P1 = 363.77 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor =
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
Shear force at d/2 from face of pedestal
Critical shear section = #NAME? mm from face of column (As per cl34.2.4.1 IS456:2000)
Factor =
Shear force at critical section = #NAME?
= #NAME? kN

MAXIMUM MOMENTS AND SHEAR

Sec. 1 Sec. 2 MAXIMUM


Factored Moment /m #NAME? #NAME? #NAME? kN.m / m - width
Factored Shear /m #NAME? #NAME? #NAME? kN / m -width

REINFORCEMENT CALCULATIONS:

Bottom Reinforcement :
Mu = #NAME? kN.m
Mu/bd2 = #NAME?
= #NAME? N/mm2
Pt = #NAME? % #NAME?
Ast require = #NAME? mm2
(max. of Pt & 0.12%)
Req. Spaci = #NAME? mm
Provide 20 @ 200 mm C/C , (Both ways) Pt = #NAME?

CHECK FOR ONE WAY SHEAR

Maximum shear force Vu = #NAME? kN


Width of pilecap at shear section = 1000 mm
Shear stress, tv = #NAME? N/mm
#NAME? tc = 0.29 N/mm (IS456:2000 Table 19)
Enhanced Shear Stress = 2d x tc/av av = d/2 (IS456:2000 Cl.40.5.1)
= 1.16 N/mm
#NAME? #NAME? N/mm
#NAME?

file:///conversion/tmp/scratch/368927121.xls,DSN(B) KM/ST 10/17/2017


DESIGN OF TOP REINFORCEMENT
SEC 1 SEC 2
JOINT 0
GRID 0

750
P2 P1
1500
750

500 1500 500

2500

DATA :

Pedestal Size : Grade :


Width B = 500 mm Concrete Grade, fck = 30 N/mm
Depth D = 500 mm Strength of Steel, fy = 390 N/mm
Height hped = #NAME? mm
Rebar and Cover:
Assuming the Dia of Main Bar = 20 mm
Clear Cover to the Tie Reinf. = 75 mm
Effective Cover 75+20/2 = 85 mm
Eff. Depth of Pile Cap deff = #NAME? mm

LOADS ON PILE CAP

Soil Weight = #NAME? kN/m2 Depth of soil filling = #NAME? m


Due to Grade slab = 5.0 kN/m2 unit wt. of Soil = #NAME? kN/m
Overburden load = #NAME? kN/m2 Thickness of PC = #NAME? m
Self Weigth of pile cap = #NAME? kN/m2 pile diameter = 750 mm
Total pressure = #NAME? kN/m2

ANALYSIS - MOMENTS AND SHEAR

Section 1
Min. factored pile reaction in piles P2 = 291.31 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor for pi
(+ve for pile outside the critical section)
Distance from face of Ped. to edge of PC = 1000 mm
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
Section 2
Min. factored pile reaction in piles P1 = 291.01 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor =
B.M at the face of pedestal = #NAME?
= #NAME? kN.m

file:///conversion/tmp/scratch/368927121.xls,DSN(T) KM/ST 10/17/2017


MAXIMUM MOMENTS

Sec. 1 Sec. 2 Maximum -ve moment (if any)


Factored Moment /m #NAME? #NAME? 0.00 kN.m / m - width

REINFORCEMENT CALCULATIONS:

Top Reinforcement :
Mu = 0.00 kN.m
Mu/bd2 = #NAME?
= #NAME? N/mm2
Pt = #NAME? % #NAME?
Provide minimum reinforcement since there is no negative moment
Ast require = #NAME? mm2
(max. of Pt & 0.12%)
Req. Spaci = #NAME? mm
Provide 20 @ 200 mm C/C , (Both ways) Pt = #NAME?

file:///conversion/tmp/scratch/368927121.xls,DSN(T) KM/ST 10/17/2017