Certificate Completion For Replace Baffle Plate in Feed Water Tank
Certificate Completion For Replace Baffle Plate in Feed Water Tank
6
(Rev. 01) Page 1 of 1
PO NO: 2017-1475
In accordance with the requirements of the Contract Between GE and Contractor, the undersigned Contractor
hereby states that the above named project has been fully completed in accordance with the requirements of the
Contract Documents.
All applicable tests, certificates and regulatory inspections required by the GE have been performed with respect
to the completed project.
_________________________________________
(Mr. Prasong Singthom)
By _______________________________________
( )