Qty Unit Price GST Total Price

S No. Description (Nos) (PKR) (PKR) (PKR)


1 Devolving 15
2 De-gasification. 30
3 Internal cleaning. 30
4 De-denting.
5 Hydro testing 100%. (Double of Service Pressure) 50
6 Shot blasting. 30
7 Coro Zinc. (If required). 300
8 Powder Coating. 800
9 Logo Stencil. 25
10 Replacement of Shroud. (If required). 400
11 Replacement of foot/Base ring. (If required). 500
12 Compact Valve (If required). 255
13 Pneumatic Test (Pressure 100-110PSI). 25
14 Transportation & loading unloading (round trip)
Inspection points:
Thickness gauging.
Hydro & Pneumatic Testing.
Surface Treatment.
Paint Powder.
15 Assessment of tare weight
Fixing of Valves.
Pneumatic test 100%.
Punching of tare weight & Serial No.
Stenciling of Logo & Tare weight
(as per given Logo)
Surface Treatment:
Grit SAE-G18 (Shot Blasting).
One coat Coro Zinc.
Powder & Logo Stencil:
Powder Paint 100 microns (Min.).
(Jotun or Diamond Paints)

SCOPE OF SERVICES
BURSHANE LPG
Cylinder 45.4 Kg