Sections

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Notes:

1.All dimensions to be checked on the site.

2.where applicable the contractor is to


check on site size of components to
manufactured before production.

3.Contractor is responsible for the correct


setting out of the buildings, all external and
internal walls with particular reference to
boundaries , building lines e.t.c.
4. Contractors to verify all levels , heights and
dimensions on site and to check the same
against the drawings before commercement of
Construction.
DISCLAIMER
The elements shown on this drawing have been
approved by the client , and he accepts

3970
responsibility for materials , content and
statement

5166
434112050
0 72
0 Project:

875
Dinning Porch PROPOSED RESIDENTIAL
DEVELOPMENT @
2566

OGWA,UMUEZEALAIJE,OCHII OGWA,

2400
2125

2100
Lounge
OGWA, MBAITOLI LOCAL
GOVERNMENT AREA ,IMO STATE
150
150
150

Client:
SECTION B'B

Mr. UZUEGBU ISHMAEL


998

UGOCHUKWU

3886
consultants:
3046

HAMZ PROJECTS & LOGISTICS LTD.


Architecture,Building / Civil Engineering,Property
900 450

Development.
Master's Ante-

1950
150

Bedroom Lounge
Room PLOT 127 IKENEGBU EXTENSION
OWERRI,IMO STATE
1350

1390

07037592537

75
Bedroom
2450

3,3rd Eweka street,


Benin City, Edo State.

1425
450 750

designed Henry Ugochukwu


sheet no.
SECTION A'A drawn Henry Ugochukwu

checked Ifeanyi Obani

Approved
scale Nil
5
date July,2017

You might also like