Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

SUB CONTRACTOR

THE CLIENT THE CONSULTANT MAIN CONTRACTOR


LOGO ( IF ANY)

LOGO

INSPECTION & TEST PLAN:

ITP NO :
PROJECT: ART CENTER MALL B+G+M+1 COMMERCIAL BUILDING Revision :
Date :
Page NO. :

ACCEPTANCE INSPECTION ACTION


Test Method VERIFYING TPI /
INSPECTION / TEST STAGE CRITERIA /
SPECIFICATION /
(Visual or
Responsible Frequency
DOCUMENTS ABC Consultant Subcontr
document
PROCEDURE actor
review)

A. Preparatory Works

B. Actual Works
SUB CONTRACTOR
THE CLIENT THE CONSULTANT MAIN CONTRACTOR
LOGO ( IF ANY)

LOGO

ACCEPTANCE INSPECTION ACTION


Test Method VERIFYING
INSPECTION / TEST STAGE CRITERIA / TPI /
(Visual or DOCUMENTS
SPECIFICATION /
document
Responsible Frequency ABC Consultant Subcontr
PROCEDURE actor
review)

Prepared by: Accepted by:

_________________________________ ________________________________________

QA/QC Engineer / Inspector Engineer

You might also like